Commercial EV Charging in Dallas: Free Fast Chargers for DFW Property Owners

Commercial EV charging in Dallas is growing quickly, and property owners can get Level 3 fast chargers installed at $0 by hosting them. We fund, build and operate the chargers at qualifying DFW properties and pay the owner monthly stall rent or a profit share for about 5 parking spaces. Busy retail centers, restaurant pads, grocery-anchored sites and convenience stores along major Dallas corridors are the strongest candidates.

The timing is good. North Texas is adding EVs faster than most of the country, and public fast charging hasn’t caught up. If you own a busy commercial property in Dallas or the surrounding counties, submit it for a free qualification check.

How fast is EV demand growing in Dallas-Fort Worth?

Fast. According to the North Central Texas Council of Governments, the 16-county DFW region ended 2025 with 166,349 registered EVs, up from 120,798 a year earlier. That’s an increase of 45,551 vehicles, or 38%, in one year.

Statewide, the trend is the same. TxDOT reported in October 2026 that Texas EV registrations have climbed to 532,282, up from 456,667 in February.

How much public fast charging does Texas have?

Not much relative to that demand. The U.S. Department of Energy’s Alternative Fuels Data Center lists 3,861 public charging locations in Texas with 5,676 DC fast ports and 7,455 Level 2 ports (data updated October 27, 2026).

Metric (Texas unless noted)FigureSource
Registered EVs, DFW 16-county region (end of 2025)166,349NCTCOG
One-year growth in DFW EVs+45,551 (38%)NCTCOG
Registered EVs, Texas (October 2026)532,282TxDOT
Public charging locations3,861AFDC
Public DC fast charging ports5,676AFDC
Registered EVs per public DC fast portabout 94Calculated from TxDOT and AFDC figures

The last row is our own math (532,282 EVs divided by 5,676 fast ports). It’s a rough ratio, not a forecast, but it shows why well-located fast chargers in a growing metro tend to stay busy.

What public funding is flowing into Texas charging?

Texas was allocated $323.08 million in federal NEVI formula funds over five years, according to a Texas Transportation Commission minute order. In Phase II, TxDOT awarded $226 million for 321 charging stations, including 264 in metropolitan planning areas and 57 in county seats.

Those grants go to the companies that build and operate stations, and TxDOT’s Phase II program requires a signed site host form showing the property owner agrees to the installation. In other words, owners matter. When a developer like us brings capital, the property owner’s role is to provide the site, and in return you get paid for it.

Public agencies in the region have their own path, too. NCTCOG’s North Texas EV infrastructure call for projects was open to public entities with property in the 16-county region, including Dallas County.

How does Oncor fit into a Dallas charging project?

Oncor runs the transmission and distribution system across much of DFW, so any new fast-charging service starts with an Oncor request. Oncor’s EV page directs business customers to its New Construction Portal to find out whether a location needs an upgrade.

The timelines are worth knowing. Oncor’s commercial and industrial load requirements form says to allow up to 10 business days for a preliminary cost estimate, at least 3 more weeks to schedule a crew, and a 14 to 16 week lead time for all three-phase transformers.

That’s why utility work is usually the longest step in any fast-charging build. When you host with us, we handle the Oncor coordination, the load paperwork and the cost of the service. You sign the site agreement; we do the rest.

Which Dallas properties qualify for free fast chargers?

Busy, amenity-rich commercial properties in dense suburban or urban trade areas. Across DFW, that typically means:

  • Grocery-anchored and big-box shopping centers along major arterials and highway frontage roads.
  • Restaurant and quick-service pads where drivers can eat during a 20 to 30 minute charge.
  • Convenience stores and travel stops near highway exits.
  • Mixed-use properties with retail, dining and public parking.

Rural sites and thin trade areas generally don’t qualify. For a quick score, run our 10-point property self-check, and if you own a c-store, see our guide to EV charging for convenience stores.

What does a Dallas owner get from hosting?

Here’s the deal structure at qualifying properties:

  • Cost: $0. We pay 100% of equipment, installation, utility coordination and permitting.
  • Space: about 5 parking spaces (4 charging stalls plus an equipment area), expandable to 8 stalls.
  • Pay: fixed monthly stall rent or a share of net charging revenue, your choice.
  • Chargers: Level 3 DC fast chargers up to 500 kW, with most sessions running 20 to 30 minutes.
  • Operations: we own, operate and maintain everything, cover repairs and damage, pay the electricity and handle sales tax on charging, with a 99%+ uptime standard.
  • Term: 10 to 15 years.

Our sites average 10+ sessions per charger per day, or 40+ visits daily from a 4-charger site. To compare deal types before you talk to anyone, read our EV charging station land lease guide and the host agreement checklist.

Should a Dallas business buy Level 2 chargers instead?

Only if your visitors park for hours. Offices, apartments and hotels often want Level 2 for employees, residents and overnight guests. We install Level 2 as well, but the owner pays, so it makes the most sense where utility or state incentives cover 60 to 70% or more of the project. For short-stop retail traffic, fast charging is the better match and, at qualifying sites, it’s free to you.

We’re also building in other fast-growing Sun Belt metros. See our guides to commercial EV charging in Phoenix and Las Vegas.

How do I get started in Dallas?

Send us your property address and parking count. We’ll screen the site for nearby fast chargers, traffic, trade-area density and power availability. Qualified sites receive a no-cost proposal and letter of intent, then we handle the lease, Oncor coordination, permitting and construction.

Submit your Dallas-area property for a free qualification check.

Frequently asked questions

Can I get free commercial EV chargers in Dallas?

Yes, if your property qualifies. We pay 100% of the cost of Level 3 fast chargers at qualifying DFW commercial properties, including equipment, installation, Oncor coordination and permitting, and you earn monthly stall rent or a profit share.

How many EVs are registered in Dallas-Fort Worth?

The North Central Texas Council of Governments reports 166,349 registered EVs in the 16-county DFW region at the end of 2025, a 38% increase from 120,798 a year earlier.

How long does Oncor take to provide power for EV chargers?

Oncor’s commercial load requirements form says to allow up to 10 business days for a preliminary estimate, at least 3 more weeks to schedule a crew, and a 14 to 16 week lead time for three-phase transformers. Permits and easements can add time.

Is Texas funding new EV charging stations?

Yes. TxDOT awarded $226 million in federal NEVI funds for 321 charging stations in Phase II, including 264 in metropolitan planning areas. Texas was allocated $323.08 million in NEVI formula funds over five years.

What kinds of Dallas properties qualify for free fast chargers?

Busy, amenity-rich retail and mixed-use properties in dense suburban or urban trade areas, such as grocery-anchored centers, big-box retail, restaurant pads and convenience stores near major roads. Rural sites and thin trade areas generally don’t qualify.