Denver is one of the strongest EV markets in the country, and its fast-charging network hasn’t caught up. Nearly one in three new vehicles sold in Colorado in the third quarter of 2025 was an EV, yet Department of Energy data shows just 205 public DC fast-charging ports at 55 locations with Denver addresses, against 1,426 public Level 2 ports. Several fast-growing suburbs have only one or two fast-charging locations.

Colorado still funds charging, but the grants go to whoever owns and operates the chargers, they require a cash match, and the latest Charge Ahead Colorado round closed Oct. 16, 2026. For most commercial owners, the simpler path is to host. We install Level 3 fast chargers at $0 cost to qualified Denver-area properties and pay monthly stall rent or a profit share. Submit your Colorado property for a free qualification check.

How big is EV demand in the Denver area?

Colorado is the national leader by sales share. The Colorado Energy Office reported that 32.4% of new vehicles sold in the state from July through September 2025 were EVs, the highest single-quarter share any state had recorded, and that Colorado had passed 210,000 EV registrations.

The fast-charging network is spreading across the state. According to CDOT (Aug. 27, 2026), Colorado has about 486 public fast-charging locations, and 83% of the state highway network is within 30 miles of one. But highway coverage isn’t the same as convenient charging where people shop and live, and that’s where the Denver metro gaps are.

Where are the fast-charging gaps around Denver?

We pulled every open, public charging station in Colorado from the Department of Energy’s Alternative Fuels Data Center on Oct. 29, 2026, counted by the city in each station’s address.

CityPublic charging locationsLevel 2 portsDC fast portsLocations with DC fast
Denver4971,42620555
Aurora992636414
Lakewood39757210
Broomfield88172399
Westminster72123219
Thornton4270386
Littleton49138196
Centennial3473194
Highlands Ranch1635243
Parker295982
Brighton428281
Colorado total2,9296,1911,707495

Three patterns stand out:

  • Denver is Level 2-heavy. The city has about 7 public Level 2 ports for every fast-charging port. Level 2 suits long stays, but a driver who needs range in 30 minutes has relatively few options.
  • The southeast and northeast suburbs are thin. Parker has 2 fast-charging locations, Brighton 1, and Highlands Ranch 3.
  • Statewide, about 123 registered EVs share each public fast-charging port (210,000 EVs / 1,707 ports). The EV count is from October 2025, so today’s ratio is likely higher.

A busy, visible retail property on an arterial in one of those suburbs is exactly the kind of site we look for.

What EV charging grants can Denver businesses get?

Colorado has two main state programs. Both pay the entity that will own and operate the chargers, which matters if you’d rather not run a charging business.

ProgramWhat it paysKey rulesStatus (Oct. 29, 2026)
Charge Ahead ColoradoDC fast over 100 kW: up to $35,000 per port ($40,000 enhanced). Level 2: $5,000 ($7,000 enhanced)20% minimum match (10% for qualifying entities); $250,000 max per standard round; projects completed before an executed grant agreement aren’t eligibleSeptember round closed Oct. 16, 2026; awards expected November; next standard round opens January 2027
DCFC Plazas (NEVI and state funds)Per-port incentives that vary by location, with enhanced amounts for priority communities and battery storageAt least 4 ports, each delivering at least 150 kW; match varies, up to 80%; applicant must own and operate the chargersRound open Sept. 28 to Nov. 13, 2026, about $14 million
Federal 30C tax creditCredit for business charging equipmentn/aEnded for property placed in service after June 30, 2026 (IRS FAQ)

The City and County of Denver’s own mobility incentive is aimed at Level 1 charging at multifamily housing, not commercial fast charging (Denver Mobility Incentive Program).

What this means in practice: a Denver owner who wants fast chargers through grants has to become a charging operator, front the cash match and the rest of the project, and win a competitive round. When we host on your property, we’re the owner and operator, so any grant application is ours to make and fund.

What does Xcel Energy offer for commercial charging in Colorado?

Xcel Energy serves most of the Denver metro. Its Colorado EV Supply Infrastructure program can provide the make-ready work for selected public charging sites: a dedicated EV meter cabinet, panel, conduit and conductor, owned and maintained by Xcel, at no cost to the participant (line extension costs can apply), according to Xcel’s public charging program summary. Sites need at least four ports (or 50 kW), separately metered service, the property owner’s written consent and land rights for Xcel’s equipment. You still buy the chargers. Selection runs in rounds, so check with Xcel for current availability before you plan around it.

Whoever builds the station, the utility work is usually the longest step. When we host, we handle the Xcel application, design and coordination.

How does EV charger permitting work in Denver-area cities?

Colorado now pushes cities toward faster, more predictable charger permits. Under the state’s EV Charging System Permits law (HB24-1173), municipalities with 10,000 or more people and counties with 20,000 or more had to take a compliance action by Dec. 31, 2025: adopt the Colorado Energy Office’s model land use code, adopt the standards in the law, or formally opt out (Colorado Energy Office). They must also report permitting times for charging applications received through Dec. 1, 2026.

So the rules in Denver, Aurora, Lakewood or Parker may differ, depending on which path each chose. State grant programs also require accessible design for all charging projects; see our guide to ADA EV charging requirements for the stall and aisle layout.

Which Denver-area properties qualify for free fast chargers?

The best candidates are places where drivers will stay 20 to 30 minutes:

  • Grocery-anchored and big-box centers along arterials such as Colorado Boulevard, I-25, I-225, C-470 and E-470
  • Restaurant pads and quick-service food outparcels
  • Busy mixed-use and lifestyle centers in Aurora, Lakewood, Littleton, Parker, Highlands Ranch and Broomfield
  • Properties with a visible corner of the lot, 24/7 access and room for about 5 spaces

Rural sites and thin trade areas generally don’t qualify. For the big-box angle, see our guide to EV charging for big box stores. Not sure about your site? Our is my property good for EV chargers self-check takes two minutes.

Applying for grants vs. hosting with us

Build with Colorado grantsHost Level 3 chargers with us
Who applies and owns the chargersYou, as owner and operatorWe do
Up-front costAt least a 20% match plus everything grants don’t cover$0
Electricity, demand charges, sales taxYouWe pay them
Maintenance, damage and reportingYouWe handle it, to a 99%+ uptime standard
Your incomeCharging revenue minus all costsMonthly stall rent or a profit share
Space and termYour choiceAbout 5 spaces (4 stalls, expandable to 8), 10-15 years

Our chargers deliver up to 500 kW, most sessions take 20 to 30 minutes, and our sites average 10+ sessions per charger per day. We also install Level 2 chargers, which the owner pays for; in Colorado, Charge Ahead’s Level 2 grants can offset part of that cost, including a year-round rolling lane for Level 2 requests of $50,000 or less. If you own a busy commercial property in the Denver area, submit it for a no-cost qualification check.

Frequently asked questions

Are there grants for commercial EV charging in Denver?

Yes. Charge Ahead Colorado pays up to $35,000 per DC fast port over 100 kW ($40,000 enhanced) with a 20% match; its next standard round opens January 2027. The DCFC Plazas program is open Sept. 28 to Nov. 13, 2026 for sites with at least four 150 kW ports. Both pay the entity that owns and operates the chargers.

Does Xcel Energy pay for EV charging infrastructure in Colorado?

Xcel’s Colorado EV Supply Infrastructure program can provide Xcel-owned make-ready infrastructure at no cost to selected public charging sites with at least four ports or 50 kW, though line extension costs can apply and you still buy the chargers. Selection runs in rounds.

How many fast chargers are in Denver?

Department of Energy data pulled Oct. 29, 2026 shows 205 public DC fast ports at 55 locations with Denver addresses, compared with 1,426 public Level 2 ports. Parker has 2 fast-charging locations and Brighton has 1.

Is the federal EV charger tax credit still available in Colorado?

No, not for new equipment. The federal 30C credit ended for charging property placed in service after June 30, 2026.

Can a Denver business get EV chargers installed for free?

Yes, if the property qualifies. We pay 100% of the cost of Level 3 fast chargers, own and maintain them, pay for electricity, and pay you monthly stall rent or a profit share over a 10 to 15 year term.