Commercial EV Charging in Miami: 28.4% Utilization, FPL Credits and How Owners Host Fast Chargers at $0 (2026)

Miami is one of the two busiest fast-charging metros in the country, and the main local incentive pays for wiring, not chargers. Miami’s public fast chargers ran at 28.4% utilization in the third quarter of 2026, second only to Los Angeles among the top 30 U.S. metros and well above the 15.9% national average. FPL’s Make-Ready Credit pays up to $30,000 per 150 kW port toward utility-side infrastructure, capped at $120,000 for a 4-port site. On a 4-stall, 150 kW site that costs about $894,000 in our model, that’s about 13%.

So most Miami property owners shouldn’t buy fast chargers outright. We install Level 3 chargers on qualifying commercial properties at $0 to the owner and pay monthly stall rent or a share of net charging revenue. Submit your Miami property for a free qualification check.

How busy are fast chargers in Miami?

Very. An independent Q3 2026 U.S. fast-charging industry report ranked Miami second among the top 30 metros at 28.4% utilization, behind Los Angeles at 31.8%. Utilization is the share of time a port spends charging a car.

Miami also added 102 fast-charging ports in the quarter, the third most among the 10 busiest metros. Its port count grew 8% while utilization slipped 2.1 points, which the report reads as new supply easing wait times. Even after that, a typical Miami fast port was busy almost twice as often as the national average. Florida as a whole ran at 19.4%.

For an owner, that means two things. Demand is real and proven. And new sites are landing quickly, so the best-located parcels get taken first.

How many public chargers does Miami have?

We pulled public, open stations from the U.S. Department of Energy’s Alternative Fuels Data Center station locator on Nov. 2, 2026.

Area (city names as listed)Public locationsLocations with DC fastDC fast portsLevel 2 ports
City of Miami385372711,080
Miami-Dade cities (Miami, Miami Beach, Hialeah, Doral, Coral Gables, Aventura, Homestead and others)808705052,091
Fort Lauderdale (for comparison)14914117295
Florida statewide4,4489305,4669,957

Only 70 locations across these Miami-Dade cities offer fast charging, and Level 2 ports outnumber fast ports about 4 to 1. Level 2 is too slow to matter for a driver who stops for 25 minutes. Fast charging isn’t. Counts only include addresses listed under these city names, so stations listed under unincorporated place names may be undercounted.

What incentives can Miami businesses get for EV chargers?

IncentiveWhat it paysWhat it covers4-stall 150 kW site ($894K)
FPL EVolution Make-Ready Credit, 50-149 kWUp to $20,000 per port, $120,000 site capService lines, transformers, switchgear, conduit, trenching, padsn/a at 150 kW
FPL Make-Ready Credit, 150-249 kWUp to $30,000 per port, $180,000 site capSameUp to $120,000 (13%)
FPL Make-Ready Credit, 250 kW and upUp to $50,000 per port, $300,000 site capSameUp to $200,000 for 4 ports, on more expensive hardware
FPL Make-Ready Credit, Level 2Up to $1,200 per portSamen/a
Federal 30C tax creditEnded for property placed in service after June 30, 2026 (IRS FAQs)$0

Source: FPL’s EVolution Make-Ready Credit program page. FPL says the credit doesn’t cover the chargers themselves, customer-side equipment or maintenance, and funding is first-come, first-served until the budget runs out.

Our Level 2 note applies here too. We install Level 2, for example at hotels, but Level 2 needs owner money and makes the most sense where incentives cover roughly 60 to 70% or more of the cost. On our 8-port, $80,000 hotel Level 2 benchmark, FPL’s credit would be at most $9,600, or 12%. For a Miami hotel or retail center, fast charging hosted at $0 usually pencils out better.

Worked example: buying vs. hosting fast chargers in Miami

You buy the chargersYou host with us
Project costAbout $894,000 in our model$0
FPL Make-Ready CreditUp to $120,000 at 150 kW, if eligible and funds remainNot needed
Your net upfront costAbout $774,000 or more$0
FDACS registration and device permitsYou file annuallyWe handle it
Electricity, demand charges, maintenance, sales taxYou pay and manageWe pay and manage
Your incomeCharging revenue minus all costsMonthly stall rent or a share of net revenue
TermEquipment life10 to 15 years

To see how gross revenue per charger adds up, read how much EV charging stations make.

What permits does a Miami EV charging station need?

Florida took EV charger rules away from cities and counties in 2024. Under Section 366.94, Florida Statutes, regulation of EV charging stations is preempted to the state, and a local government “may not enact or enforce an ordinance or regulation related to electric vehicle charging stations.” Local governments still issue permits, but only based on state rules and state law.

The Florida Department of Agriculture and Consumer Services sets those rules in Chapter 5J-28. According to FDACS, owners or operators of public chargers must register them annually, and every charger that charges drivers a fee also needs a weights and measures device permit. When we build, we’re the operator, so we file the registration, permits and inspections.

Which Miami properties are the best fit?

We look for busy, amenity-rich sites where drivers already spend 20 to 30 minutes:

  • Grocery-anchored and big-box centers in Doral, Kendall, Hialeah and Miami Gardens.
  • Restaurant and quick-service pads on major corridors.
  • Convenience stores and gas station outparcels with 24/7 access.
  • Hotels and mixed-use projects near the airport, Brickell and Midtown.
  • Parking structures with ground-level spaces near the utility service. Our parking garage EV charging guide covers placement and code.

You’ll need about 5 parking spaces: 4 charging stalls plus a small equipment area, expandable to 8 stalls. Our chargers deliver up to 500 kW, and most EVs charge in about 20 to 30 minutes, so stalls turn over quickly. Our sites average 10 or more sessions per charger per day. Rural sites and thin trade areas generally don’t qualify, but that’s rarely the issue in Miami-Dade.

How does hosting work for a Miami property owner?

  1. You submit your address and number of parking spaces.
  2. We screen nearby fast chargers, traffic, trade-area density and FPL power availability.
  3. Qualified sites get a no-cost proposal and letter of intent.
  4. We sign a 10 to 15 year lease, coordinate with FPL, pull permits and build.
  5. We own, operate and maintain the chargers, pay the electricity and handle sales tax and damage repairs, with a 99%+ uptime standard.

Utility service upgrades usually take the longest, so timelines vary by site. If you want a comparison with the only metro busier than Miami, see our guide to commercial EV charging in Los Angeles. When you’re ready, see if your Miami property qualifies for free EV chargers.

Frequently asked questions

Are fast chargers busy in Miami?

Yes. Miami’s fast-charger utilization was 28.4% in Q3 2026, second among the top 30 U.S. metros behind Los Angeles and well above the 15.9% national average, according to an independent industry report.

Does FPL offer rebates for commercial EV chargers?

FPL’s EVolution Make-Ready Credit pays toward utility-side infrastructure for public fast chargers: up to $20,000 per port at 50-149 kW, $30,000 at 150-249 kW and $50,000 at 250 kW and up, with site caps of $120,000, $180,000 and $300,000. Level 2 gets up to $1,200 per port. It doesn’t cover the chargers, and funding is first-come, first-served.

Can Miami-Dade or a city in Miami-Dade add its own EV charger rules?

No. Since 2024, Section 366.94 of the Florida Statutes preempts EV charging station regulation to the state. Local governments still issue permits, but only based on state rules set by the Florida Department of Agriculture and Consumer Services.

Do EV chargers in Florida have to be registered?

Yes. Owners or operators of public chargers must register them annually with FDACS, and chargers that charge a fee also need a weights and measures device permit. When we host chargers on your property, we handle that.

How much does a commercial fast-charging site cost in Miami?

In our model, a 4-stall, 150 kW site costs about $894,000 all-in. FPL’s make-ready credit could cover up to $120,000 of that. Hosting with us costs the property owner $0.

How many parking spaces do I need to host fast chargers?

Plan on about 5 spaces: 4 charging stalls plus a small equipment area. Many sites start with 4 stalls and expand to 8 as demand grows.