Commercial EV Charging in Phoenix and Scottsdale: APS vs. SRP Incentives and the $0 Fast-Charging Option
If you own commercial property in Phoenix, Scottsdale or elsewhere in the Valley, your EV charging options depend on which utility serves you. APS states that business EV charging station incentives and make-ready programs are not currently available (APS). SRP pays $2,500 per networked Level 2 port and, according to SRP’s FY27 rebate application, up to $20,000 per business location installing one to four DC fast-charging stations or up to $40,000 for five or more, capped at 75% of project cost (SRP; SRP FY27 application). Neither covers most of a fast-charging project, which is why many Arizona owners host chargers instead of buying them.
We install Level 3 DC fast chargers at $0 cost to qualified commercial properties, including in the Phoenix metro, and pay owners monthly stall rent or a share of charging profit. Submit your Arizona property for a free qualification check.
How much EV charging demand is there in Arizona?
It’s growing faster than public charging. The U.S. Department of Energy’s Alternative Fuels Data Center lists 141,800 electric vehicles registered in Arizona in 2025, plus 33,900 plug-in hybrids, against 4,802 public charging ports statewide (AFDC Arizona data). That’s roughly 30 battery-electric vehicles for every public port, and only a share of those ports are fast chargers.
For Phoenix-area owners, busy Valley retail corridors are exactly the kind of dense, affluent trade areas where fast chargers get used. Our sites average 10+ sessions per charger per day.
What EV charger incentives does APS offer businesses?
None right now. APS’s EV page says business EV charging station incentives and make-ready infrastructure programs are not currently available. Businesses can still request an EV Charging Site Review for planning or submit a project through the APS Construction Portal, but the site review doesn’t reserve capacity. Capacity is reserved only after you submit the project with plans, documents and deposits (APS).
APS previously ran the Take Charge AZ pilot, which installed up to four Level 2 charging plugs. Nonprofits, schools, multifamily properties and municipalities got 100% of construction and installation covered, while other businesses had to match 50% of construction and installation costs and pay for the electricity (APS Take Charge AZ FAQ). It was a Level 2 program, not fast charging.
What does SRP pay for business EV chargers?
SRP’s FY27 business EV charging program covers installations from May 1, 2026 to April 30, 2027. SRP’s FY27 rebate application lists these amounts, with more detail than SRP’s web page:
| SRP rebate | General businesses | Government, tribal, school, nonprofit, multifamily, small business* |
|---|---|---|
| Networked Level 2 port | $2,500 per port, up to 75% of project cost | $3,500 per port, up to 100% of project cost |
| DC fast charging, 1 to 4 stations | Up to $20,000 per location, up to 75% of project cost | Up to $25,000 per location, up to 100% of project cost |
| DC fast charging, 5 or more stations | Up to $40,000 per location, up to 75% of project cost | Up to $45,000 per location, up to 100% of project cost |
| Level 2 prewiring | $300 per circuit new construction / $500 retrofit | Same |
Sources: SRP business EV charger rebate and SRP FY27 EV charger and prewire rebate application. *Under the application, a small business qualifies for the higher amounts if its total SRP energy usage over the previous 12 months is below 300,000 kWh. SRP’s two sources don’t fully match: the web page says DC fast stations must supply at least 50 kW and lists only the 1 to 4 station amounts, while SRP’s FY27 application lists DC fast chargers rated at 40 kW or more and adds the 5+ station tier and the project-cost caps. If you’re considering a charger between 40 and 49 kW, confirm eligibility with SRP first. To get the 5+ station amount, the chargers must be installed at the same time at the same location, and the application limits Level 2 rebates to 40 networked ports per program year. You must be an SRP nonresidential customer in good standing, the customer of record at the site, and have the legal right to install there. Pre-approval is required for projects with an anticipated rebate of $15,000 or more, and the application says DC fast projects need approval before you buy equipment. Completed rebate applications are due by October 31, 2027 for installations finished in the program year. It’s a reimbursement backed by paid invoices, so you front the cost.
Worked example: what Valley owners actually pay
Here’s how those incentives play out on two benchmark projects. The project budgets are our planning models, not quotes. Real costs vary by site and utility.
| Project | Budget | SRP rebate | Owner share after SRP | APS territory |
|---|---|---|---|---|
| Hotel, 8 networked Level 2 ports | About $80,000 | $20,000 (8 x $2,500), about 25% | About $60,000 | No current business incentive; owner pays about $80,000 |
| Retail center, 4 stalls of 150 kW DC fast charging | About $894,000 | $20,000 (1 to 4 station tier), about 2% | About $874,000 | No current business incentive; owner pays about $894,000 |
| Same fast-charging site, hosted by us | $0 to the owner | Not needed | $0, and the owner earns rent or a profit share | $0 |
The takeaway: in the Valley, incentives cover only a small slice of either project. Level 2 makes the most sense where incentives cover the majority of the cost, and that isn’t the case for most Phoenix-area businesses today. Hosted fast charging is the route that costs nothing.
We do still install Level 2 chargers in Arizona, especially for hotels that want overnight guest charging, and we’ll price the SRP rebate into the quote. For more on hotel projects, see our guide to hotels with electric car charging.
How do I know if my property is served by APS or SRP?
Check your electric bill. The Valley is split between the two utilities, and the boundary doesn’t follow city lines neatly, so neighboring properties can have different programs. If you submit your property to us, we’ll confirm the utility and its current rules during screening.
Which Phoenix-area properties qualify for free fast chargers?
The best sites are busy, amenity-rich retail and mixed-use properties in dense, affluent suburban or urban areas, where drivers happily spend 20 to 30 minutes. In the Valley, that often means:
- Grocery-anchored and big-box shopping centers along major arterials and near freeway interchanges.
- Restaurant pads and quick-service food outparcels.
- Convenience stores and gas stations with room for about 5 spaces.
- Mixed-use and entertainment districts with restrooms and food on site.
Rural sites and thin trade areas generally don’t qualify. Our post on EV chargers for grocery stores explains why grocery lots perform so well, and DC fast chargers for business covers costs and power needs in more depth.
Is my Phoenix property a good fit? 60-second check
Say yes to four or more and your site is worth submitting:
- The property is in a busy Valley trade area with steady daily traffic.
- You can set aside about 5 adjacent spaces: 4 charging stalls plus a small equipment area.
- The spaces are visible from a main road and reachable 24/7.
- Drivers have restrooms, food or shopping within a short walk.
- There’s no fast-charging station already on your lot or right next door.
- You own the property or can get the owner’s consent.
One Arizona-specific tip: shade matters. The U.S. Access Board recommends shelters at charging stations to protect users from extreme sun and heat, noting that black charging cables in extreme heat can burn people with limited sensation (U.S. Access Board). If your lot already has shade structures near a good corner, mention it when you submit.
For space planning, see how many parking spaces an EV charging station needs.
What hosting looks like for an Arizona owner
We pay 100% of the cost, including equipment, installation, utility coordination with APS or SRP, and permitting. We own, operate and maintain the Level 3 chargers, which deliver up to 500 kW, so most EVs recharge in about 20 to 30 minutes. We pay for the electricity, handle damage and repairs, and manage sales tax on charging. Equipment carries a 99%+ uptime standard.
You choose fixed monthly stall rent or a profit share of net charging revenue, over a 10 to 15 year agreement. Sites typically start with 4 stalls and can expand to 8. Our guide on how to become an EV charging station host walks through every step.
Own commercial property in Phoenix, Scottsdale, Tempe, Mesa, Chandler or Gilbert? Submit your property for a free EV charger qualification check. Qualified sites get a no-cost proposal and letter of intent.
Frequently asked questions
Does APS offer rebates for business EV chargers?
Not currently. APS says business EV charging station incentives and make-ready infrastructure programs are not available right now. Businesses can request an EV Charging Site Review for planning or submit a project through the APS Construction Portal.
How much is the SRP rebate for business EV chargers?
For the May 1, 2026 to April 30, 2027 program year, SRP’s FY27 application lists $2,500 per networked Level 2 port for general businesses and up to $20,000 per location for one to four DC fast-charging stations, or up to $40,000 for five or more, capped at 75% of project cost. Government, tribal, school, nonprofit, multifamily and qualifying small business customers get $3,500 per Level 2 port and up to $25,000 (1 to 4 stations) or $45,000 (5 or more) per DC fast location, up to 100% of project cost. The application lists DC fast chargers rated at 40 kW or more, while SRP’s web page says at least 50 kW.
Can a Phoenix business get EV chargers installed for free?
Yes, if the property qualifies for our host program. We pay 100% of equipment, installation, utility coordination and permitting for Level 3 fast chargers, and the owner earns stall rent or a profit share. Utility rebates alone don’t cover most of the cost.
How many EVs are registered in Arizona?
The U.S. Department of Energy’s Alternative Fuels Data Center lists 141,800 electric vehicles and 33,900 plug-in hybrids registered in Arizona in 2025, with 4,802 public charging ports statewide.
How many parking spaces do I need to host fast chargers in Arizona?
Plan on about 5 spaces: 4 charging stalls plus a small equipment area for the transformer and switchgear. Many sites start with 4 stalls and expand to 8.
Does Level 2 charging make sense for a Phoenix hotel?
It can, if guest demand justifies it. With SRP’s $2,500 per port rebate, an 8-port, $80,000 project still leaves the owner about $60,000, and APS currently offers no business incentive. We install Level 2 and price in any available rebate.