Commercial EV Charging in Portland: What Owners Can Still Get While PGE Rebates Are Waitlisted (Beaverton, Hillsboro, Gresham)

For commercial EV charging in Portland right now, the main open incentive is ODOT’s Community Charging Rebates: up to $8,000 per Level 2 port or $80,000 per DC fast port, capped at 80% of eligible costs and $249,000 per site. PGE’s business EV charging rebates are out of funding and only taking waitlist requests. If your property is in the part of North or Northeast Portland served by Pacific Power, its business rebates are still open. New multifamily, mixed-use and commercial parking projects also face EV-ready conduit rules, which are a cost, not a rebate.

For most Portland owners, that means a Level 2 project can still be mostly funded if you move fast, but a fast-charging site leaves roughly $645,000 for the owner to pay. That’s why many owners host fast chargers instead. We fund, install and operate Level 3 chargers at $0 to the owner and pay monthly stall rent or a profit share. See if your Portland-area property qualifies for free EV chargers.

What’s open for Portland businesses (Nov. 4, 2026)

ProgramWho it’s forAmountStatus
PGE business EV charging rebatesPGE business, fleet and multifamily customersLevel 2 up to $2,000 per port; fast chargers in underserved communities up to $55,000 per port ($330,000 per site)Funding exhausted; waitlist only
ODOT Community Charging Rebates, Round 5Businesses, nonprofits, public entities, Tribes, multifamily owners$8,000 per Level 2 port, $80,000 per fast port, up to 80% of costs, $249,000 per siteOpen, first-come, first-served, no deadline
Pacific Power business charger rebatesPacific Power customers onlyUp to $3,500 per Level 2 port; up to $30,000 per 150 kW+ fast port; $100,000 per siteOpen; funds limited
PCEF Community GrantsNonprofits, for projects inside PortlandLarge and small grants; public charging is an eligible project type2026 application window (Mar. 25 to May 27) has closed
PGE Drive Change FundLocal EV charging, adoption and education projectsNot listedPGE asks you to get in touch

PGE’s rebate page says that “due to high demand, program funding has been exhausted,” and it can’t approve new reservations. You can join the waitlist through PGE’s PowerClerk portal. Holders of approved reservations can still claim their rebates. For the full PGE story, see our PGE EV charger rebate guide.

Check your bill: PGE or Pacific Power?

Most of the Portland metro is PGE territory, but parts of North and Northeast Portland are served by Pacific Power (see its service area page). That one detail changes your incentives. A Pacific Power customer can claim its open charger rebate first and then stack ODOT on top. Our Pacific Power EV charging guide walks through that stack.

How ODOT’s rebate works in the Portland metro

ODOT’s Round 5 guidelines (revised Oct. 16, 2026) pay the lower of the per-port amount or 80% of eligible project costs. The 95% rate only applies in 10 rural counties, and Multnomah, Washington and Clackamas aren’t among them.

The bigger issue is which funding bucket your site falls into. ODOT reserves 70% of funds for “priority communities” (rural or low-income areas), and you check your address on ODOT’s locator map. ODOT’s tracker lists:

  • Level 2, non-priority: $96,000
  • Level 2, priority (outside the 10 reserved counties): $152,000
  • DC fast, non-priority: $960,000
  • DC fast, priority (outside the 10 reserved counties): $2,320,000

A single 8-port hotel project can claim $64,000, so the non-priority Level 2 bucket covers about one and a half projects like that for the whole state. Once a bucket is reserved, new applicants go on a waitlist funded only by returned rebates. Our ODOT Community Charging Rebates guide has the application steps.

Portland’s EV-ready rules for new buildings

If you’re building, Portland’s zoning code requires EV-ready conduit, not chargers. According to Portland’s parking requirements page:

New development typeEV-ready parking required
5+ dwelling units with 1 to 6 parking spaces100% of new spaces
5+ dwelling units with 7 or more spaces50% of new spaces, or 6, whichever is greater
New Commercial Parking uses (parking not tied to one use)20% of new spaces

The city’s EV Ready Code Project rules took effect March 31, 2023. Statewide, Oregon’s building code requires 20% EV-ready spaces in new privately owned commercial buildings. EV-ready means conduit and planned electrical capacity for at least a Level 2 charger, so the owner still has to fund or attract the chargers later. Fast chargers are a separate decision.

Worked example: an 8-port hotel Level 2 project in Tigard

A hotel near I-5 in Tigard, in PGE territory, budgets $80,000 for 8 public Level 2 ports.

ScenarioPGE rebateODOT rebateTotalHotel pays
Today (PGE waitlisted)$0$64,000 (lower of 8 x $8,000 or 80% of $80,000)$64,000 (80%)$16,000
If PGE’s waitlist clears ($2,000 x 8)$16,000$51,200 (80% of the remaining $64,000)$67,200 (84%)$12,800
ODOT bucket already reserved$0Waitlist$0$80,000

ODOT requires you to apply for other incentives first, and those incentives reduce the cost its 80% is based on. That’s why the second row gets less from ODOT. We can install Level 2 too, and the first two rows are where it makes sense. If you want us to check where your hotel stands, submit your property.

Worked example: a 4-stall DC fast site in Hillsboro

Four 150 kW DC fast chargers at a busy retail center off US-26, about $894,000 all-in:

Line itemOwner-fundedHosted by us
Project cost$894,000$894,000, paid by us
PGE fast-charger rebate$0 today (waitlisted, and limited to underserved communities)Not your concern
ODOT rebate: lower of $320,000, 80% of cost, or the $249,000 site cap$249,000 (28%)Part of our utility and incentive coordination
Owner’s remaining costAbout $645,000$0
Electricity, demand charges, repairsOwnerWe pay
Owner incomeCharging margin, if anyMonthly stall rent or profit share

Even with the full ODOT rebate, an owner-funded fast site leaves about 72% of the cost with the owner. Our guide to how much EV charging stations make shows why utilization decides whether that pays back.

Where fast charging is thin in the Portland metro

We pulled open, public charging stations from the U.S. Department of Energy’s Alternative Fuels Data Center (AFDC) station API on Nov. 4, 2026, matched by city name in the station address. These are rough counts:

CityPublic locationsLevel 2 portsDC fast portsSites with DC fastSites with 4+ fast ports
Portland2625901353315
Beaverton4811560106
Hillsboro931731782
Tigard30743383
Lake Oswego35831042
Gresham2337821
Salem12720949165

Hillsboro stands out. It has 93 public charging locations but only 17 fast ports, and just two sites with four or more. Gresham has two fast-charging sites for a city of its size. Busy grocery-anchored, restaurant and retail properties in those cities are the sites we screen first.

How a hosted $0 fast-charging site works

  • You pay $0. We fund the chargers, installation, utility coordination and permitting.
  • You earn fixed monthly stall rent or a share of charging profit for 10 to 15 years.
  • We need about 5 parking spaces: 4 stalls, expandable to 8, plus an equipment area.
  • We install Level 3 chargers up to 500 kW, so most sessions take 20 to 30 minutes.
  • We pay the electricity, handle maintenance and damage, keep a 99%+ uptime standard, and manage sales tax on charging.

Our sites average 10+ sessions per charger per day, bringing drivers onto your property while they charge. Submit your Portland-area property for a free fast-charger review.

Frequently asked questions

Are PGE’s business EV charger rebates available in Portland right now?

No new approvals. PGE says funding has been exhausted and it can’t approve new reservations or unreserved applications. You can join a waitlist through its PowerClerk portal, and holders of approved reservations can still claim their rebates.

What EV charging incentive can Portland businesses still use?

ODOT’s Community Charging Rebates Round 5 is open on a first-come basis. It pays up to $8,000 per Level 2 port or $80,000 per DC fast port, limited to 80% of eligible costs and $249,000 per site. Pacific Power customers in Portland can also use Pacific Power’s open rebates.

Does Portland require EV chargers in new buildings?

It requires EV-ready conduit, not chargers. New developments with 5+ units need 100% of new spaces EV-ready if they have 1 to 6 spaces, or 50% (minimum 6) if they have more. New Commercial Parking uses need 20%.

How much would an 8-port hotel Level 2 project cost in Portland after rebates?

On an $80,000 project, ODOT alone can pay $64,000 (80%), leaving $16,000, if the Level 2 funding bucket isn’t already reserved. If PGE’s waitlist clears, coverage rises to about 84%.

How much does ODOT cover on a four-stall fast-charging site?

On a four-stall, 150 kW site costing about $894,000, ODOT’s $249,000 site cap covers about 28%. The owner still funds roughly $645,000 plus operating costs.

Can I get fast chargers in Portland without paying for them?

Yes, if your property qualifies. We fund, install and operate Level 3 fast chargers at $0 to the owner, pay monthly stall rent or a profit share, and cover electricity, maintenance and damage.