Commercial EV Charging in Tucson: TEP Rebates Have Closed, Here’s the $0 Fast-Charging Path
If you own commercial property in Tucson, the utility rebate route for EV chargers has closed, but you can still add Level 3 fast charging at $0. Tucson Electric Power (TEP) says its Smart EV Charging Program rebate applications are closed. Meanwhile, the City of Tucson’s development code requires EV charging infrastructure in new commercial parking, and it gives extra credit for Level 3 fast chargers. We install, own and operate Level 3 fast chargers at qualifying Tucson properties at no cost, and pay the owner monthly stall rent or a profit share.
Have a busy Tucson property with about 5 spaces to spare? Submit it for a free qualification check.
Does TEP offer rebates for commercial EV chargers?
Not right now. TEP’s Smart EV Charging Program page states that rebate applications are closed. The program offered rebates and technical support to commercial businesses, multifamily complexes and nonprofits that bought and installed charging ports. TEP still points businesses to an EV Charger Project Guide and to commercial EV charging rate plans on the same page.
What that means for owners:
- Buying chargers yourself now means paying full price, without a TEP rebate to offset the cost.
- Level 2 is harder to justify. We install Level 2 chargers, for example at hotels, but Level 2 requires owner money and makes the most sense where utility or state incentives cover 60 to 70% or more of the cost. Without a TEP rebate, most Tucson Level 2 projects fall well short of that.
- The $0 host model doesn’t depend on a rebate. We fund the equipment, installation, utility coordination and permitting ourselves.
If your property is in the Phoenix area instead, incentives differ by utility; see our Phoenix and Scottsdale commercial EV charging guide for the APS and SRP picture.
What does Tucson’s EV charging code require for commercial properties?
Tucson’s Unified Development Code Section 7.4.11, adopted by Ordinance 11953 and effective December 1, 2022, sets minimum EV requirements as a percentage of required parking for new development. Selected uses from Table 7.4.11-1:
| Land use | EV installed | EV ready | EV capable |
|---|---|---|---|
| Shopping center | 5% | None | 10% |
| Food service (restaurants) | 5% | None | 10% |
| Food and beverage sales (grocery) | 5% | None | 10% |
| General merchandise and large retail | 5% | None | 10% |
| Commercial recreation and entertainment | 5% | None | 10% |
| Administrative and professional office | None | 5% | 15% |
| Lodging (hotels) | None | 5% | 15% |
| Multifamily | None | 10% | 20% |
Source: Tucson UDC 7.4.11. Other rules in the same section matter for owners:
- Small sites are exempt. Retail and several commercial uses, including food service and personal services, with fewer than 50 total required parking spaces are exempt from the minimums.
- Level 3 gets extra credit. The published code text says each installed Level 3 charging station meets the requirement for three EV charging spaces.
- Accessible charging. Four percent of EV charging spaces, but no fewer than one, must meet accessible parking design standards, separate from your required accessible parking.
- Expansions. For an expansion of an existing site, the requirement is based on the parking added, not the whole lot.
The city amended these rules in March 2025 to clarify expansions and allow right-sizing when less parking is provided, according to the City of Tucson EV Readiness page. City staff had also proposed changing the Level 3 credit ratio, so confirm the current ratio with Planning and Development Services before you design around it. Existing lots that aren’t being built or expanded aren’t forced to add chargers; hosting is voluntary.
Worked example: a new 160-space shopping center in Tucson
Here’s how the code math can work for new development, using the published Level 3 credit. This is illustrative; your plan reviewer has the final word.
| Item | Value | Basis |
|---|---|---|
| Required parking spaces | 160 | Example site |
| EV installed required (5%) | 8 spaces | 160 × 5% |
| EV capable required (10%) | 16 spaces | 160 × 10% |
| Credit per installed Level 3 station | 3 spaces | Tucson UDC 7.4.11.B.4 (confirm current ratio) |
| Level 3 stations needed to cover the 8 installed spaces | 3 | 8 ÷ 3, rounded up |
| Our standard hub | 4 Level 3 chargers | 4 stalls plus equipment area, expandable to 8 |
| Owner cost for the hub | $0 | We fund equipment, install, utility work and permits |
The point for developers: a fast-charging hub you host at no cost may also cover the “EV installed” piece of your code requirement, instead of paying for a row of Level 2 chargers yourself. EV-capable conduit and the accessible-space rule still apply, so coordinate early with your civil engineer and with us.
Is there demand for fast charging in Tucson?
Arizona’s EV fleet is large relative to public charging. The U.S. Department of Energy’s Alternative Fuels Data Center lists 141,800 electric vehicles and 33,900 plug-in hybrids registered in Arizona in 2025, against 4,822 public charging ports statewide (AFDC Arizona data). That’s roughly 29 battery-electric vehicles per public port, and only part of those ports are fast chargers.
Tucson also sits on two interstates, I-10 and I-19, so busy properties near interchanges see both local drivers and through travelers who need a fast charge.
Which Tucson properties qualify for free fast chargers?
The strongest sites are busy, amenity-rich retail and mixed-use properties in dense suburban or urban areas, where drivers happily spend 20 to 30 minutes:
- Grocery-anchored and big-box shopping centers.
- Restaurants and restaurant pads on busy arterials.
- Gas stations and c-stores near interstate exits.
- Car dealerships with frontage outside any after-hours gate.
- Hotels near the interstates, for fast charging, with owner-funded Level 2 considered separately.
Rural sites and thin trade areas generally don’t qualify. Our sites average 10+ sessions per charger per day, and we need a location that can reach that. To pre-screen your property, use our EV charger site assessment scorecard.
What hosting looks like for a Tucson owner
- Cost: $0. We pay 100% of equipment, installation, utility coordination with TEP and permitting.
- Space: about 5 spaces, 4 stalls plus an equipment area, expandable to 8.
- Chargers: Level 3 DC fast chargers up to 500 kW; most sessions take 20 to 30 minutes.
- Income: monthly stall rent or a share of net charging revenue, your choice.
- Term: 10 to 15 years.
- Operations: we handle maintenance, damage repair, electricity and sales tax, with a 99%+ uptime standard.
Before you sign anything, read our checklist of 12 clauses to check in an EV charging host agreement. When you’re ready, send us your Tucson property’s address and parking count. We screen nearby fast chargers, traffic, trade-area density and power availability, and qualified sites get a no-cost proposal and letter of intent.
Frequently asked questions
Does Tucson Electric Power offer EV charger rebates for businesses?
Not currently. TEP’s Smart EV Charging Program page says rebate applications are closed. TEP still offers commercial EV charging rate plans and an EV Charger Project Guide.
Does Tucson require EV chargers in commercial parking lots?
For new development, yes. Tucson UDC Section 7.4.11 requires a percentage of required parking to have EV infrastructure, such as 5% EV installed and 10% EV capable for shopping centers, restaurants and most retail. Retail and several commercial uses with fewer than 50 required spaces are exempt, and existing lots aren’t required to retrofit.
Do Level 3 chargers count extra under Tucson’s EV code?
The published code text says each installed Level 3 charging station meets the requirement for three EV charging spaces. City staff proposed changing that ratio, so confirm the current credit with Planning and Development Services.
Can a Tucson business get EV chargers installed for free?
Yes, if the property qualifies for our Level 3 program. We pay for equipment, installation, utility coordination and permitting, then own and operate the chargers and pay you stall rent or a profit share for 10 to 15 years.
Does Level 2 charging make sense for a Tucson hotel?
It can, but it requires owner money, and with TEP’s rebate closed, few Tucson projects reach the 60 to 70% incentive coverage where Level 2 pencils out best. Many hotels near the interstates are better candidates for $0 Level 3 fast charging.