Duke Energy EV Charger Rebate for Businesses: 2026 Charger Prep Credit Amounts (NC, SC, FL)
Duke Energy’s EV charger rebate for businesses is the Commercial Charger Prep Credit: a one-time check that covers part of the make-ready electrical work for a Level 2 or DC fast charger, not the charger itself. In North Carolina, Duke lists up to $963 per public Level 2 charger and up to $2,781 per 50 kW public fast charger. In Florida, it lists up to $1,192 per public Level 2 charger and up to $9,391 per 50 kW public fast charger. South Carolina business customers can also apply. You must apply within 120 days of your final invoice or approved permit.
That money helps on a small Level 2 job. On a fast-charging site, it covers only a sliver of the cost. That’s why many Duke-territory property owners host fast chargers instead. We fund, install and operate Level 3 chargers at $0 to the owner and pay monthly stall rent or a profit share. Check if your property qualifies for free EV chargers.
What is the Duke Energy Charger Prep Credit?
It’s Duke’s business EV incentive in the Carolinas and Florida. According to Duke’s Commercial Charger Prep Credit page, it’s a one-time credit that helps business customers pay to prepare a site for an EV charger. It works for workplaces, businesses, multifamily properties, transit stations and schools.
Here’s what the credit covers and what it doesn’t:
- Covered: make-ready work such as underground boring, conduit, wiring and electric panel work needed to support Level 2 or higher chargers.
- Not covered: the charger hardware and software, charger installation, permit fees, and service upgrades on Duke’s side of the meter.
- Not covered either: any Contribution in Aid of Construction you owe under Duke’s Line Extension Plan if your site needs a new service or upgrade. Duke says the credit can’t be applied to that cost.
Duke’s business EV page lists the Charger Prep Credit for North Carolina, South Carolina and Florida. In Indiana, the business offer is Charger Solution, where you rent a charger from Duke for a flat monthly fee. No commercial prep credit is listed there.
How much is the Duke Energy EV charger rebate?
These are the maximum credit amounts Duke publishes per charger, which we pulled from its North Carolina and Florida program pages on Nov. 3, 2026:
| Segment | North Carolina (up to) | Florida (up to) |
|---|---|---|
| Public Level 2 charger | $963 | $1,192 |
| Workplace Level 2 charger | $725 | $2,410 |
| Fleet Level 2 charger | $886 | $4,619 |
| Multifamily Level 2 charger | $1,605 | $1,192 |
| Multifamily DC fast charger | $4,634 | $9,391 (50 kW) |
| Public DC fast charger (50 kW) | $2,781 | $9,391 |
| Workplace DC fast charger (50 kW) | not listed | $12,256 |
| Fleet DC fast charger (50 kW) | not listed | $22,556 |
| School bus DC fast charger (50 kW) | $13,630 | $16,751 |
| Transit bus DC fast charger (50 kW) | $30,347 | $26,938 |
Three details matter more than the headline numbers:
- The credit is per charger, not per port. Duke’s estimator says nameplate kW “does not vary if it is a single or dual port charger.”
- Above 50 kW, there’s no posted number. If your chargers total more than 50 kW, or a single fast charger is bigger than 50 kW, Duke asks you to submit a form for an estimate. Most new public fast chargers are 150 kW or more, so a modern fast-charging site falls in this group.
- Service upgrades change the math. Duke’s calculator shows separate results with and without a service upgrade or new service, and it says the credit depends on whether the site triggers the Line Extension Plan.
That “up to $30,347” figure you’ll see quoted online is the North Carolina transit bus amount. It isn’t what a hotel, shopping center or restaurant gets.
Who qualifies, and how do you apply?
You must be a nonresidential Duke Energy customer in an eligible state, and an electrical contractor must do the make-ready work. In North Carolina, work completed after May 19, 2022 is eligible. In Florida, the start date is January 1, 2025. Either way, you have to apply within 120 days of the later of your most recent invoice or your approved permit date.
Duke’s online application asks for:
- Detailed contractor invoices with labor and materials listed separately, plus the contractor’s name, address and phone number
- A schematic diagram for any job with more than one charger or any Level 3 charger
- A copy of the approved local permit
- A Customer Usage Profile form with the estimated hours of use for each charger
Because it’s a reimbursement, you pay the contractor first and get a check after approval. Need help with the permit piece? See our guide to EV charging station permits.
How far does the credit go on a real project?
We ran the posted amounts against two benchmark projects from our cost models: an 8-port Level 2 hotel install at about $80,000 all-in, and a 4-stall, 150 kW DC fast charging site at about $894,000 all-in.
| Project | Duke credit (best case from posted amounts) | Share of project cost | Who still pays the rest |
|---|---|---|---|
| 8 single-port public Level 2 chargers, NC ($80K) | 8 × $963 = $7,704 | about 10% | Owner, about $72,300 |
| 8 single-port public Level 2 chargers, FL ($80K) | 8 × $1,192 = $9,536 | about 12% | Owner, about $70,500 |
| 4 × 150 kW public fast chargers, NC or FL ($894K) | No posted amount above 50 kW; estimate by request | For scale, the 50 kW amounts equal about 1% (NC) to 4% (FL) of the roughly $223,500 per-stall cost | Owner, nearly all of it |
| 4 × 150 kW fast chargers hosted with us | Not needed | Not applicable | Us. Owner pays $0 |
If the Level 2 chargers are dual-port units, the Level 2 credit is roughly halved, because it’s paid per charger.
For a hotel, a roughly 10% to 12% credit usually isn’t enough to make owner-paid Level 2 pencil on its own. We generally recommend owner-paid Level 2 where incentives cover 60% to 70% or more of the cost. Our hotel EV charger installation guide compares markets where that happens. In Duke territory, fast charging is usually the better play for a busy commercial property because the developer carries the cost.
What’s the alternative to the Duke rebate for fast charging?
Host instead of buy. For qualifying commercial properties in Duke’s North Carolina, South Carolina and Florida service areas, and anywhere else in the U.S., we:
- Pay 100% of equipment, installation, utility coordination and permitting, so you invest $0
- Install Level 3 DC fast chargers up to 500 kW, where most EVs charge in 20 to 30 minutes
- Use about 5 parking spaces: 4 charging stalls plus a small equipment area, expandable to 8 stalls
- Pay you monthly stall rent or a profit share for a 10 to 15 year term
- Pay the electricity, maintenance, damage repairs and sales tax, with a 99%+ uptime standard
Our sites average 10 or more sessions per charger per day, so a 4-charger site brings 40 or more drivers a day to your property, and each one stays 20 to 30 minutes. Compare the two options in what a Level 3 charging station costs to install and how an EV charging host agreement works.
Which Duke Energy properties are the best fit?
The properties we look for in Charlotte, Raleigh-Durham, Greensboro, Greenville-Spartanburg, Columbia, Tampa-St. Petersburg, Orlando and the rest of Duke territory are:
- Grocery-anchored and big-box shopping centers
- Restaurants, coffee and quick-service pads on busy corridors
- Convenience stores and fuel sites near highway exits
- Mixed-use and retail properties in dense, higher-income trade areas
- Lots with about 5 spare spaces in a visible corner, with 24/7 access
Rural sites and thin trade areas usually don’t qualify. Our property self-check walks through the factors we score.
Next step
If you’re weighing a Duke credit against a fast-charging project, send us the property first. We’ll tell you whether it qualifies for hosted Level 3 charging at $0, and you can still use Duke’s credit for any Level 2 work you choose to own. Submit your property for free EV chargers.
Frequently asked questions
Does Duke Energy offer an EV charger rebate for businesses?
Yes. Duke’s Commercial Charger Prep Credit is a one-time credit for business customers in North Carolina, South Carolina and Florida. It covers make-ready electrical work for Level 2 or DC fast chargers, but not the charger, installation, permits or utility-side upgrades.
How much is the Duke Energy Charger Prep Credit?
It depends on the state, segment and charger size. Duke’s posted maximums include $963 per public Level 2 charger and $2,781 per 50 kW public fast charger in North Carolina, and $1,192 and $9,391 for those segments in Florida. Larger fast chargers need an estimate from Duke.
Does the Duke credit pay for the EV charger itself?
No. Duke says the credit doesn’t cover charging equipment, charger installation, permit fees or service upgrades outside the premise. It also can’t be applied to any Contribution in Aid of Construction you owe under Duke’s Line Extension Plan.
When do I have to apply for the Duke Charger Prep Credit?
Within 120 days of the later of your most recent contractor invoice or your approved permit date. You’ll need itemized invoices, the permit, a usage profile form and, for multi-charger or Level 3 jobs, a schematic diagram.
Can I get fast chargers in Duke Energy territory without paying for them?
Yes, if your property qualifies. We fund, install and operate Level 3 fast chargers at $0 to the owner and pay monthly stall rent or a profit share for 10 to 15 years. We also pay the electricity, maintenance and damage repairs.
Is Duke’s credit enough to make a hotel Level 2 install worth it?
Usually not on its own. On an 8-port, $80,000 hotel Level 2 project, the posted public Level 2 amounts cover about 10% in North Carolina and 12% in Florida. Owner-paid Level 2 tends to make sense where incentives cover 60% to 70% or more.