EV Charging for Convenience Stores: How C-Store Owners Get Fast Chargers at $0

EV charging for convenience stores works best as Level 3 DC fast charging, because a 20 to 30 minute charge lines up with a coffee, a snack and a restroom stop. The good news for owners is that you don’t have to fund it. At qualifying c-stores, we pay 100% of the equipment, installation, utility coordination and permitting, then pay you monthly stall rent or a profit share for about 5 parking spaces.

Convenience retail is already where drivers expect to refuel, and EV drivers feel the same way. If your store sits on a busy road in a populated area, check whether it qualifies for free fast chargers before you price out equipment yourself.

Why are convenience stores a good fit for EV charging?

Because drivers already think of them as the place to stop. NACS Magazine reports that a May 2025 NACS consumer survey found drivers consider convenience stores the best location for public EV chargers. The same article notes that only 53% of drivers say they have a garage, driveway or other suitable place to charge at home, which means a large share of future EV owners will rely on public charging.

Dwell time is the other half of the case. Convenience Store News reports that EV charging customers are often on the lot for 15 to 20 minutes, and that industry experts see EV drivers spending more in the store than the average fuel customer. A fuel customer can pump and leave in a few minutes. A charging customer has time to walk inside.

How big is the opportunity right now?

Public charging is growing fast, but it’s still far smaller than fueling. According to the Alternative Fuels Data Center station counts (updated October 27, 2026), the U.S. has 83,589 public charging locations with 79,247 DC fast charging ports.

NACS Magazine puts that in context: there are roughly 150,000 fueling locations in the country, about 122,000 of them convenience stores, and they average 9.8 fueling positions each, or about six times as many fueling nozzles as public charging positions. That gap is the opportunity. Stores that add fast charging now become the default stop for EV drivers on their road.

What do the numbers look like for a c-store host?

Here’s how hosting with us compares with buying chargers yourself.

ItemYou buy and run fast chargersYou host with us
Upfront costEquipment, installation and utility work (often six figures per site)$0
Electricity and demand chargesYou payWe pay
Maintenance, repairs, damageYou arrange and payWe handle it, 99%+ uptime standard
Sales tax on chargingYou collect and remitWe handle it
Your incomeCharging revenue minus costs, if utilization holdsFixed monthly stall rent or a share of net charging revenue
TermEquipment life10 to 15 years
In-store sales from driversYoursYours

The cost line isn’t an exaggeration. A McKinsey analysis estimates a 150 to 350 kW charging unit at $45,000 to over $100,000, plus $40,000 to over $150,000 for installation, before any grid upgrades. For more on owner-funded costs, see our guide to Level 3 charging station installation cost.

Will chargers actually bring more people into my store?

They’re designed to. Our sites average 10+ sessions per charger per day, or 40+ visits daily from a 4-charger site, and top locations reach 80 or more. Each of those drivers stays 20 to 30 minutes.

Independent research backs the general effect. An MIT study of California charging stations found that a new station raised annual spending at nearby businesses by 1.4% in 2019 and 0.8% from 2021 to mid-2023, with the strongest effect within about 100 yards. The study’s lead author even pointed to the joint gas station and convenience store model as one EV charging could adopt.

What does a convenience store need to qualify?

A busy location, about 5 spaces, and public access. Here’s a quick self-check for c-store owners:

  1. You own the property or can get the owner’s sign-off for a 10- to 15-year agreement.
  2. You can set aside about 5 parking spaces in one group (4 charging stalls plus a small equipment area), ideally away from fuel islands and delivery lanes.
  3. The store is on a busy road, near a highway exit, or in a dense suburban or urban neighborhood.
  4. The lot is open to the public late or 24/7.
  5. There are no fast chargers right next door.

Space is usually the hardest part at a c-store, since many lots weren’t designed with charging in mind. Convenience Store News makes the same point and adds that DC fast charging needs 480-volt, three-phase power, which can take utility coordination. When you host with us, that coordination is our job, and we pay for it.

If you have pumps on site, our guide to EV chargers for gas stations covers fuel-island layouts and canopy questions. For a full property scorecard, use our 10-point self-check.

Should a c-store own its chargers instead?

Some chains do, and industry voices in Convenience Store News argue that retailers who own or closely manage charging can capture more of the upside. That’s a real option if you have capital, a power-buying strategy and a team to keep chargers running.

For most single-site and small-chain owners, the risk is the problem. McKinsey modeled a four-charger, 150 kW station at 15% utilization and found it would lose roughly $40,000 to $50,000 a year before subsidies. Hosting gives you income from day one and keeps every in-store dollar the drivers spend, without carrying that risk.

What about Level 2 at a convenience store?

Level 2 is rarely the right fit for a c-store, because it adds range slowly and drivers won’t stay for hours. We do install Level 2, but it’s owner-funded and makes the most sense for long-dwell properties like hotels and offices where incentives cover 60 to 70% or more of the cost. At a convenience store, fast charging is the tool that matches how customers use the site.

How do I get started?

Send us the store address and parking count. We’ll screen the site for nearby fast chargers, traffic, trade-area density and power availability. Qualified stores get a no-cost proposal and letter of intent, then we handle the lease, utility coordination, permitting and construction.

Submit your convenience store for a free qualification check and find out what your spaces could earn.

Frequently asked questions

Can a convenience store get EV chargers for free?

Yes, if the site qualifies. We pay 100% of the equipment, installation, utility coordination and permitting for Level 3 fast chargers at qualifying c-stores, and you earn fixed stall rent or a share of net charging revenue for about 5 parking spaces.

How long do EV drivers stay at a convenience store?

Convenience Store News reports EV charging customers are often on the lot for 15 to 20 minutes. With our Level 3 chargers delivering up to 500 kW, most sessions run about 20 to 30 minutes, which is enough time to shop inside.

How many parking spaces does a c-store need for fast chargers?

Plan on about 5 spaces: 4 charging stalls plus a small equipment area for the transformer and switchgear. Sites can expand to 8 stalls as demand grows.

Who pays for the electricity at a hosted c-store charger?

We do. We collect the charging revenue, pay for the power, and handle sales tax collection and remittance on charging. You keep your in-store sales and receive regular revenue reports.

What power does a convenience store need for DC fast charging?

DC fast charging in the U.S. requires 480-volt, three-phase power, and many sites need a utility service upgrade. When you host with us, we coordinate and pay for that work.