EV Charging for Mixed-Use Developments: How to Split Chargers Between Residents, Offices and Retail

EV charging for mixed-use developments works best when you split it by user, not by building. Residents and office tenants park for hours, so Level 2 chargers fit them. Retail and restaurant visitors stay 20 to 30 minutes, so Level 3 fast charging fits them. Federal station data backs this up. Among public charging sites tagged as shopping centers, 91% have DC fast charging. Among sites tagged as multifamily, just 1% do.

The split also changes who pays. Code-driven Level 2 for residents and tenants is usually an owner cost. Fast charging on the retail frontage doesn’t have to be. We fund, install and operate Level 3 fast chargers at $0 to the owner and pay monthly stall rent or a profit share. See if your mixed-use property qualifies for free EV chargers.

Why does a mixed-use property need two kinds of charging?

Because it has at least three kinds of drivers, and they park very differently:

UserTypical parking patternCharger that fitsWho usually pays
ResidentsOvernight, in assigned or garage spacesLevel 2 (or Level 1)Owner or HOA, sometimes with resident fees
Office tenants and staffMost of the workdayLevel 2Owner or tenant
Retail, restaurant and gym visitorsMinutes to a couple of hours, all weekLevel 3 DC fastCan be $0 to the owner with a funded developer
Pass-through drivers20 to 30 minute top-upsLevel 3 DC fastSame as above

Put fast chargers in a resident garage and they sit idle overnight while residents hog them. Put only Level 2 on the retail side and visitors leave before they get much charge. Splitting by user avoids both mistakes.

What does the station data say about each use?

We counted every open public charging location in the U.S. Department of Energy’s Alternative Fuels Data Center by the facility type the station lists (developer.nlr.gov API, national pull of Nov. 3, 2026). Only about 21% of locations carry a facility tag, so read these as patterns, not a census:

AFDC facility typePublic locationsWith DC fastShare with DC fastLevel 2 ports
Shopping center1,6371,49491%567
Grocery43934879%206
Restaurant55034663%516
Hotel2,75634713%8,242
Parking garage351237%2,450
Office building542306%2,291
Multifamily54171%3,538
All public locations83,77915,92219%n/a

The pattern is consistent. Where people stop briefly (retail, grocery, restaurants), operators build fast charging. Where people park for hours (homes, offices, garages), they build Level 2. A mixed-use site has both kinds of parking, so it should have both kinds of chargers.

How do building codes count EV spaces on a mixed-use site?

Rules vary by city, and many places have none for existing buildings. Two examples show how mixed-use gets handled.

**Charlotte’s development ordinance.** Charlotte’s UDO Article 19.3, in effect since June 2023, applies to multifamily stacked dwellings, residential components of mixed-use developments, hotels, and parking lots and structures. As summarized in the Electrification Coalition’s case study: 10 to 25 spaces need 20% EV-capable; 26 to 50 need 20% EV-capable plus one installed charger; above 50, it’s 20% EV-capable plus 2% installed.

**The 2024 IECC model (Appendix CG).** The model energy code’s optional commercial EV appendix, as summarized in the North Central Texas Council of Governments’ 2025 codes briefing, sets percentages by occupancy. For mercantile (Group M) and business (Group B) it’s 15% EVSE spaces and 30% EV-capable. For R-2 multifamily it’s 20% EVSE, 5% EV-ready and 75% EV-capable. When one shared garage serves several occupancies, the required spaces are split in proportion to each occupancy’s floor area. It only applies where a city or state adopts it.

Worked example: a 400-space mixed-use garage

Here’s how the counts could work for a hypothetical project. It’s illustrative only, so ask your plans examiner how your code actually applies.

Assumption or resultCharlotte UDO (residential component)2024 IECC Appendix CG, if adopted as written
Spaces allocated to residential240240 (60% of floor area), 200 units
Residential EV-capable48 (20% of 240)150 (75% of 200 units, the lesser of units or spaces)
Residential EV-readynot required10 (5% of 200)
Residential installed chargers5 (2% of 240, rounded up)40 (20% of 200)
Spaces allocated to retail160160 (40% of floor area)
Retail EV-capablenot covered by 19.3 unless it’s a principal-use parking lot48 (30% of 160)
Retail installed chargersnot covered by 19.3 unless it’s a principal-use parking lot24 (15% of 160)

Two takeaways. First, the residential side is where code obligations pile up, and that’s Level 2 work the owner usually funds. Second, under stricter codes the retail side’s counts can be large too. If your jurisdiction lets fast chargers count toward installed-charger minimums, a hosted fast-charging site can carry part of that load at no cost to you. Ask early.

How should you lay out charging on a mixed-use site?

These rules of thumb come up again and again on mixed-use projects:

  • **Fast chargers face the retail.** Put the 4 Level 3 stalls in surface parking by the shops and restaurants, visible from the main drive and open 24/7. Don’t put them inside a gated resident garage.
  • **Level 2 goes where people sleep and work.** Resident and office chargers belong in garage levels or reserved areas, with access control if needed. See our guides to EV charging for apartments and EV charging for office buildings.
  • **Keep the fast-charging service separate.** A fast-charging site typically needs its own utility service, transformer and switchgear pad. Keeping it off the building’s main service protects residential and office capacity.
  • **Plan the equipment pad early.** Plan on about 5 spaces: 4 charging stalls plus a small equipment area. Our parking space guide shows typical layouts.
  • **Write charging into the leases.** Retail and office leases may limit what the landlord can do in common parking areas. Check exclusive-use and parking clauses before you commit stalls.

Mixed-use property self-check

Your property is likely a strong candidate for hosted fast charging if:

  • It has ground-floor retail, restaurants, a gym or a grocer that draws visitors seven days a week.
  • There’s surface or open parking near the retail entrances, not only gated garage parking.
  • You can give up about 5 spaces in a visible spot with 24/7 public access.
  • There’s room for a transformer and switchgear pad nearby.
  • It’s in a dense or affluent urban or suburban trade area.
  • There’s no busy multi-stall fast-charging site a minute or two away.

If most of those fit, submit your property for a free qualification check. We screen nearby fast chargers, traffic, trade-area density and power availability. Qualified sites get a no-cost proposal and letter of intent.

What we cover on each side

**Retail side (Level 3, $0 to you).** We pay 100% of equipment, installation, utility coordination and permitting. We install Level 3 chargers delivering up to 500 kW, so most drivers are done in 20 to 30 minutes. We own, operate and maintain them with a 99%+ uptime standard, pay for the electricity, handle sales tax and repair damage. You choose monthly stall rent or a share of net charging revenue for a 10- to 15-year term. Our sites average about 10+ sessions per charger per day, and every session is 20 to 30 minutes of a driver near your tenants.

**Residential and office side (Level 2, owner-funded).** We also install Level 2 for residents, staff and tenants. It needs owner money, so it makes the most sense where utility or state incentives cover a large share of the cost. See our Level 2 EV charger installation guide, or for retail-led centers, our shopping center approach.

Frequently asked questions

What kind of EV chargers should a mixed-use development have?

Usually both. Level 2 fits residents and office tenants who park for hours. Level 3 DC fast charging fits retail and restaurant visitors who stay 20 to 30 minutes. Federal AFDC data shows 91% of public sites tagged as shopping centers have fast charging, vs. 1% of sites tagged as multifamily.

Do mixed-use developments have to install EV chargers?

It depends on your city. Charlotte’s UDO, for example, requires 20% EV-capable spaces plus 2% installed chargers for residential components of mixed-use projects with more than 50 spaces. Many cities have no rule for existing buildings. Check your local code.

How are EV spaces counted in a shared mixed-use garage?

Under the 2024 IECC’s optional Appendix CG, when one parking facility serves several occupancies, the required EV spaces are split in proportion to each occupancy’s floor area, then each share uses its own percentage. Only jurisdictions that adopt the appendix use this method.

Can a mixed-use property get fast EV chargers for free?

Yes, if it qualifies. We pay 100% of the cost of Level 3 fast chargers on the retail side, own and run them, and pay you stall rent or a profit share. Busy, amenity-rich mixed-use sites in dense areas are the best fit.

Where should fast chargers go on a mixed-use site?

In visible surface parking near retail entrances, open 24/7, not inside gated resident garages. Plan on about 5 spaces: 4 stalls plus a small equipment area, expandable to 8 stalls.

Will fast chargers take parking from residents or tenants?

Very little. A hosted site uses about 4 to 8 spaces, and idle fees start once a car finishes charging, so stalls turn over every 20 to 30 minutes instead of being used for all-day parking.