Eversource EV Charger Rebate for Businesses: 2026 Connecticut and Massachusetts Rules, Caps and Deadlines
Eversource’s business EV charger rebate depends on your state. In Connecticut, the Eversource and UI commercial program pays up to $150,000 per DC fast charging site, or up to $250,000 in underserved communities, and up to $20,000 or $40,000 per Level 2 site. But fast-charging applications are only accepted in a spring window, which ran March 15 to June 1 in 2026. In Massachusetts, regulators cut public and workplace fast-charger equipment rebates in October 2025 and eliminated them outside environmental justice areas. Eversource has said it doesn’t expect to approve new public or workplace DC fast applications before the program ends in 2026.
If you own a busy commercial property in either state and don’t want to wait for a window or front most of the cost, there’s another route. We fund, install and operate Level 3 fast chargers at $0 to the owner and pay monthly stall rent or a profit share. Check if your property qualifies.
How much is the Eversource EV charger rebate in Connecticut?
Eversource’s Connecticut business EV charging rebates page lists these per-site maximums for the commercial program it runs with United Illuminating:
| Location | Charger type | Per-site maximum rebate | Eligible property types | Minimum |
|---|---|---|---|---|
| Baseline property | Level 2 | Up to $20,000 | Multifamily (5+ units), public, workplace | 2 ports |
| Baseline property | DC fast | Up to $150,000 | Any eligible | 2 ports |
| Underserved community | Level 2 | Up to $40,000 | Multifamily (5+ units), public, workplace | 2 ports |
| Underserved community | DC fast | Up to $250,000 | Any eligible | 2 ports |
Underserved communities are based on the state Department of Economic and Community Development’s distressed municipalities map. Eversource’s Connecticut program FAQ explains what the money covers. It includes make-ready infrastructure such as trenching, a transformer, a dedicated meter, panels, conduit and wiring, which “in some cases covers up to 100% of the cost.” It also includes rebates for up to 50% of charger equipment costs, all within the per-site caps.
When can you apply for a Connecticut DC fast charger rebate?
Only during the annual window. Eversource says the DC fast application window is typically March 15 to June 1. “This is not a rolling program,” and the dates can change. For 2026, the window closed on June 1, and Eversource’s page says it isn’t accepting DC fast applications right now. Applications are ranked after the window closes.
A few more rules from the FAQ shape the timeline:
- Apply for any new or upgraded utility service before you submit the rebate application.
- Don’t start work until you receive an incentive reservation letter, or you can lose eligibility.
- DC fast installs need an EVITP-certified contractor.
- You own the chargers, and you must maintain them for at least 5 years. They must be networked, and you pay the network fees.
- If you lease the property, the landowner has to sign the application.
- Program funding is capped each year. Once the 2026 cap is reached, applications go on a waitlist, and waitlisted applicants who resubmit in 2027 get priority.
Eversource says projects can take “a few months to over a year” from start to finish, depending on new service, equipment lead times and permits. In practice, an owner who misses the spring window is looking at a 2027 application and a later build.
What happened to Eversource’s Massachusetts fast-charger rebates?
They were cut sharply. In its October 17, 2025 order in D.P.U. 24-195, the Massachusetts Department of Public Utilities ruled on Eversource’s 2023 to 2026 Phase II EV program. For public and workplace DC fast chargers, it:
- Capped charger equipment rebates at 25% of the prior levels in environmental justice areas
- Eliminated charger equipment rebates entirely outside environmental justice areas
- Set a DC fast equipment cost cap of $100,000 per site in environmental justice areas
The order also records that Eversource “does not expect to approve any new DCFC applications under its public and workplace segment for the remainder of the EV program term, which runs through 2026.” The Massachusetts DPU’s reasoning was that utility-funded fast charging had far outpaced its targets while Level 2 lagged.
Eversource’s Massachusetts program FAQ also notes that “in most cases, customer cost-sharing will be necessary,” and that you own, operate and maintain the chargers. The next Massachusetts program cycle will have its own rules, so check Eversource before you plan around a 2027 rebate.
Worked examples: what’s left for the owner?
We ran our two benchmark projects through the Connecticut caps. These are planning illustrations from our cost models, not Eversource quotes, and assume the maximum rebate is awarded.
| Project | Max Eversource CT rebate | Share of cost | Owner still pays | Plus |
|---|---|---|---|---|
| 4 × 150 kW DC fast site, baseline town (about $894,000) | $150,000 | about 17% | about $744,000 | 5+ years of operation, networking, repairs, electricity |
| 4 × 150 kW DC fast site, underserved community (about $894,000) | $250,000 | about 28% | about $644,000 | Same |
| 8-port Level 2 hotel project, baseline town (about $80,000) | $20,000 | 25% | about $60,000 | Same |
| 8-port Level 2 hotel project, underserved community (about $80,000) | $40,000 | 50% | about $40,000 | Same |
In Massachusetts, a non-EJ public fast-charging project now gets no equipment rebate from Eversource at all.
We install Level 2 too, and we generally recommend owner-paid Level 2 where incentives cover 60% to 70% or more of the cost. Even the best Connecticut Level 2 case here reaches 50%, so run the numbers carefully. Our hotel EV charger installation guide compares markets. For fast charging, the gap is much bigger, which is why most owners host.
How does hosting compare with the Eversource rebate?
| Eversource rebate path | Hosting with us | |
|---|---|---|
| Upfront cost | Owner pays the balance, often hundreds of thousands for fast charging | $0 |
| Timing | CT DC fast: spring window only. MA: public fast-charger rebates largely gone | Rolling. Submit any time |
| Who owns and maintains chargers | You, for at least 5 years | We do, for the full term |
| Electricity, network fees, repairs, sales tax | You | We do |
| Your income | Charging margin, if utilization holds | Monthly stall rent or a profit share |
| Term | Program minimums | 10 to 15 years |
When you host, we install Level 3 DC fast chargers up to 500 kW on about 5 parking spaces (4 stalls plus a small equipment area, expandable to 8). We hold a 99%+ uptime standard. Our sites average 10 or more sessions per charger per day, bringing 40 or more drivers a day to a 4-charger site. See how an EV charging host agreement works and what a Level 3 station costs to build.
Which Connecticut and Massachusetts properties qualify for hosting?
We look for busy, amenity-rich commercial properties in dense trade areas, including Eversource-served areas such as Hartford and Stamford in Connecticut and Boston and Cambridge in Massachusetts:
- Grocery-anchored and big-box shopping centers
- Restaurants, coffee and quick-service pads on busy corridors
- Convenience stores and fuel sites near highway exits
- Medical office buildings and hospital campuses with public parking (see EV charging for hospitals)
- Lots with about 5 spare spaces in a visible spot, with 24/7 access
Rural sites with thin traffic usually don’t qualify. Run our property self-check, or compare other utilities’ programs in our Duke Energy and SCE rebate guides.
Next step
If you missed Connecticut’s 2026 window, or your Massachusetts project no longer gets a fast-charger rebate, send us the property. We’ll tell you whether it qualifies for hosted fast charging at $0. Submit your Connecticut or Massachusetts property for free EV chargers.
Frequently asked questions
Does Eversource offer EV charger rebates for businesses?
Yes, but terms differ by state. In Connecticut, the Eversource and UI commercial program pays up to $150,000 per DC fast site ($250,000 in underserved communities) and up to $20,000 or $40,000 per Level 2 site. In Massachusetts, public and workplace fast-charger equipment rebates were cut in 2025 and eliminated outside environmental justice areas.
When is the Eversource Connecticut DC fast charger application window?
Eversource says it’s typically March 15 to June 1 each year and isn’t a rolling program. The 2026 window closed June 1, and dates can change for 2027.
What does the Eversource Connecticut rebate cover?
Make-ready infrastructure such as trenching, a transformer, a dedicated meter, panels, conduit and wiring, which in some cases is covered up to 100%. It also covers up to 50% of charger equipment costs, all within the per-site cap.
Can Massachusetts businesses still get Eversource rebates for public fast chargers?
Rarely. A 2025 Massachusetts DPU order eliminated public and workplace DC fast equipment rebates outside environmental justice areas and capped them at 25% of prior levels inside those areas. Eversource said it doesn’t expect to approve new public or workplace DC fast applications through the end of 2026.
What do I have to commit to if I take the Eversource rebate?
In Connecticut you own the chargers, maintain them for at least 5 years, keep them networked and pay the network fees. You also can’t start work before receiving an incentive reservation letter.
Can I get fast chargers in Eversource territory without paying for them?
Yes, if your property qualifies. We fund, install and operate Level 3 fast chargers at $0 to the owner, pay monthly stall rent or a profit share for 10 to 15 years, and cover electricity, maintenance and repairs.