Georgia Power EV Charger Rebate: Make Ready vs. Rebate for Commercial Properties
Georgia Power has two incentives for business EV chargers, and you pick one per project. The Make Ready Infrastructure Program provides up to $300,000 in funding per qualifying project: Georgia Power designs, builds, owns and maintains the electrical infrastructure behind your meter up to the charger ports. The Business EV Charger Plus Rebate pays a cash rebate based on charger power, $150 per kW for DC fast chargers and $250 per kW for Level 2, capped at 50% of total project cost.
Make Ready fits public-facing sites with six or more ports or at least one DC fast charger, and it’s scheduled to run through December 31, 2028 or until funding runs out. The rebate fits smaller or private projects. Georgia Power states the two can’t be combined.
If you own a busy shopping center, restaurant, hotel or c-store in Georgia Power territory, there’s a third path: let a funded developer build the whole station. That’s what we do. We install Level 3 fast chargers at $0 cost to the owner and pay you stall rent or a profit share. Submit your Georgia property for a free qualification check and we’ll tell you which path makes sense for your lot.
What EV charger rebates does Georgia Power offer businesses?
Georgia Power offers business customers two programs: Make Ready infrastructure funding for public-facing projects, and the Business EV Charger Plus Rebate for smaller or private installations. Both are listed on Georgia Power’s electric transportation business programs page. Neither is open to residential customers, and Georgia Power’s own FAQ says it doesn’t offer rebates on the vehicles themselves.
The programs solve different problems. Make Ready attacks the most expensive and slowest part of a fast-charging project, the electrical service. The rebate puts cash back in your pocket after you’ve bought and installed chargers yourself.
How does the Georgia Power Make Ready program work?
Under Make Ready, Georgia Power funds up to $300,000 per qualifying project and installs, owns and maintains the infrastructure “up to but not including the charger,” according to the Make Ready program page. You still buy and install the chargers, plus extras like bollards, signage and space striping.
To be eligible, the installation must meet two tests:
- Public-facing: chargers must be in areas accessible for public use, or designated for public fleets that serve the general public.
- Charger quantity: six or more charging ports, or at least one DC fast charger.
The program is available to Georgia Power business customers, including commercial and industrial customers, municipalities, universities, schools, hospitals and multifamily developments. Georgia Power’s Make Ready terms and conditions add two cautions: projects are funded first-come, first-served, and acceptance of an application isn’t a guarantee that funds are available.
The process runs in five steps: application (you’ll need the site’s Georgia Power account number), eligibility review, an on-site assessment and design, project planning, and construction. Georgia Power notes that timelines can vary because of supply chain delays on infrastructure equipment.
How much is the Georgia Power Business EV Charger Plus Rebate?
The rebate is based on each charger’s power rating. Georgia Power’s EV Charger Plus Rebate page lists $250 per kW for chargers averaging 6.7 to 19.5 kW (estimated savings of $1,675 to $4,875 per charger) and $150 per kW for chargers averaging 62 to 200 kW (estimated savings of $9,300 to $30,000 per charger).
The fine print matters:
- The rebate is limited to 50% of total project cost, including charger, installation and materials.
- Chargers must be installed within the current calendar year, and funds are available while they last.
- Equipment must be new, NRTL certified, at least Level 2, on a dedicated circuit, and installed by a licensed electrician.
- You’ll submit site plans, spec sheets, paid invoices with a $0 balance, a signed W-9 and photos of each charger.
- Pre-approval isn’t required but is recommended. Without it, you must apply within 6 months after installation.
Make Ready vs. rebate vs. hosting: a side-by-side comparison
Here’s how the two Georgia Power programs compare with a hosted fast-charging station, using the programs’ published terms and our standard host terms.
| Question | Make Ready Infrastructure | Business EV Charger Plus Rebate | Hosted Level 3 chargers (us) |
|---|---|---|---|
| What’s covered | Electrical infrastructure up to the charger ports, up to $300K per project | Cash rebate: $150/kW (DC fast) or $250/kW (Level 2), max 50% of project cost | 100% of equipment, installation, utility coordination and permitting |
| Who buys the chargers | You | You | We do |
| Eligibility | Public-facing, 6+ ports or 1+ DC fast charger | Georgia Power business customer with permanent service | Busy commercial site with about 5 spaces |
| Who owns and maintains | Georgia Power owns the infrastructure; you own the chargers | You own everything | We own, operate and maintain everything |
| Electricity and sales tax | You | You | We pay both |
| How you earn | Your charging revenue minus costs | Your charging revenue minus costs | Monthly stall rent or a profit share |
| Deadline | Through Dec. 31, 2028 or until funds run out | Install in the current calendar year, while funds last | Rolling |
Worked example: a 4-charger DC fast site on the rebate
Say you buy four 150 kW DC fast chargers and install them yourself. At Georgia Power’s published rate of $150 per kW, each charger’s rebate would be $22,500 (150 × $150), or $90,000 for all four. That figure only applies if it stays under the 50% project cost cap, so the total project would need to cost at least $180,000.
Now look at what’s left. You still pay the other half or more of the project, including any utility upgrade, which our Level 3 charging station installation cost guide shows can be the biggest single line item. You also take on the electric bill, network fees, repairs and sales tax. If you choose Make Ready instead, Georgia Power handles the infrastructure, but you still buy the chargers and run the business.
Both programs are real money. They just leave you as the owner-operator of a charging business.
Is the federal EV charger tax credit still available in Georgia?
No, not for new projects. The federal Alternative Fuel Vehicle Refueling Property Credit (Section 30C) can’t be claimed for property placed in service after June 30, 2026, according to the IRS Form 8911 instructions. The One Big Beautiful Bill Act moved its end date up from December 31, 2032. That leaves utility programs like Georgia Power’s as the main incentives for a self-built station in Georgia.
Which Georgia properties fit fast charging best?
The rebate math matters less than the location. Drivers stop where they’d happily spend 20 to 30 minutes, so the strongest sites are grocery-anchored and big-box shopping centers, restaurants, hotels and convenience stores in dense, busy trade areas around metro Atlanta, Savannah, Augusta and Athens. Rural sites and thin trade areas generally don’t qualify for hosted chargers.
One quick check before you go further: these programs only apply if Georgia Power is your utility. Look at the electric bill for the property. If an electric membership cooperative or a city utility serves the site, Georgia Power’s programs don’t apply, though a hosted station still might.
Run your Georgia property through this 60-second self-check:
- Is the property open to the public, ideally 24/7?
- Can you set aside about 5 parking spaces in a visible corner (4 stalls plus a small equipment area)?
- Is there steady daily traffic from shoppers, diners or guests?
- Do you own the property, or can you sign a 10 to 15 year agreement for the stalls?
- Is the site within reach of a utility line for new service?
If you checked most of those boxes, our EV charging station requirements guide covers power, parking and permits in more depth.
The $0 alternative: host chargers instead of building them
When we host chargers on your lot, you skip the application, the 50% match and the operating risk. We pay 100% of equipment, installation, utility coordination and permitting. We install Level 3 DC fast chargers delivering up to 500 kW, so most EVs recharge in 20 to 30 minutes. A typical site uses about 5 spaces, starting with 4 stalls and expandable to 8.
You choose fixed monthly stall rent or a share of net charging revenue for a 10 to 15 year term. We handle maintenance, damage repair, electricity and sales tax, with a 99%+ uptime standard. Our sites average 10+ sessions per charger per day, and every one of those drivers spends 20 to 30 minutes on your property. For a deeper look at how these deals are structured, see our guide to EV charging station business models.
Make Ready runs through 2028 or until funding is used up, and it’s first-come, first-served, so there’s no advantage to waiting. Check if your Georgia property qualifies for free EV chargers. Send us the address and number of parking spaces, and we’ll screen traffic, power and nearby competition at no cost.
Frequently asked questions
Does Georgia Power offer a rebate for commercial EV chargers?
Yes. The Business EV Charger Plus Rebate pays $150 per kW for DC fast chargers (62 to 200 kW) and $250 per kW for Level 2 chargers, capped at 50% of total project cost. Chargers must be new, NRTL certified and installed in the current calendar year.
Can I combine Georgia Power Make Ready and the EV charger rebate?
No. Georgia Power’s FAQ states that business EV charger rebates and the Make Ready Program cannot be combined. Make Ready is meant for public-facing projects with six or more ports or at least one DC fast charger, and the rebate is the alternative for smaller or private projects.
Who owns the equipment under Georgia Power Make Ready?
Georgia Power installs, owns and maintains the electrical infrastructure up to but not including the charger. The business buys, installs and owns the chargers themselves, along with items like bollards, signage and striping.
How long is the Georgia Power Make Ready program available?
Georgia Power says Make Ready is scheduled to run until December 31, 2028, or until the funding threshold is met. Projects are funded first-come, first-served, so earlier applications have a better chance at available funds.
Can I get EV chargers in Georgia without paying anything?
Yes, if your property qualifies. We install Level 3 fast chargers at $0 cost to the owner, pay you stall rent or a profit share, and cover maintenance, electricity and sales tax. Submit your property at robotaxidepot.com/free-ev-chargers for a free check.