Georgia Power EV Charging for Savannah Hotels and Businesses: Make Ready, Rates and a $0 Option

Georgia Power EV charging support for commercial properties comes in three pieces: the Make Ready program, which builds and owns up to $300,000 of charger infrastructure per qualifying public project through Dec. 31, 2028; the Business EV Charger Plus Rebate, worth up to $30,000 per project; and EV-specific rates such as the Charge It (CIEV-1) rider, which discounts billing demand for the first four years. None of them buys the chargers for you. In Savannah, that means a hotel can get most of a Level 2 project’s wiring paid for, while a DC fast site still leaves the owner funding several hundred thousand dollars.

That gap is why many Savannah owners host instead. We’re a funded EV charging developer: we install Level 3 fast chargers at $0 cost to qualified commercial properties and pay you monthly stall rent or a profit share. Submit your Savannah property for a free qualification check.

What Georgia Power EV charging programs can a business use?

Georgia Power offers business customers one infrastructure program, one rebate and a set of EV rates. Here’s how they fit together, based on Georgia Power’s own program pages and tariffs as of Oct. 28, 2026.

ProgramWhat it pays forWho qualifiesKey limit
Make Ready InfrastructurePanels, wire, conduit and related electrical work up to (not including) the charger; Georgia Power designs, installs, owns and maintains itPublic-facing projects with 6+ Level 2 ports or at least 1 DC fast charger$300,000 per project unless otherwise authorized; through Dec. 31, 2028 or until funds run out
Business EV Charger Plus RebateCash rebate on chargers and installation: $250/kW for Level 2, $150/kW for DC fastGeorgia Power business customers, including smaller or private projectsUp to $30,000 per project and $60,000 per year; capped at 50% of project cost; install in the current calendar year
Charge It rider (CIEV-1)Lowers billing demand on a separately metered charging accountPremises dedicated to EV charging on a dedicated meter, on PLS, PLM or PLL ratesBilling demand factor of 0.20, 0.40, 0.60, then 0.80 over years 1 to 4, or until the 12-month load factor reaches 15%

Georgia Power presents the Charger Plus rebate as the alternative for projects that don’t qualify for Make Ready, so plan on one or the other for a given project, not both. If you want the rebate side in more detail, our Georgia Power EV charger rebate guide walks through the per-kW math.

Does a Savannah hotel qualify for Make Ready?

Usually, if the chargers are open to the public. Georgia Power’s 2026-2028 Make Ready program criteria say hospitality and entertainment sites are eligible “if the chargers are in an area that the general public may access.” Restricted chargers aren’t eligible. A guest-only garage behind a gate won’t qualify, but a surface lot that anyone can pull into will.

Check these rules before you plan a hotel project:

  • Port count: at least 6 Level 2 ports, or 1 DC fast charger.
  • Public access: chargers must be open to the general public at the same rate.
  • No future proofing: extra conduit for chargers you might add later is on you.
  • No mandated installs: Make Ready won’t fund chargers required by a city ordinance.
  • Design and contractor: Georgia Power picks the contractor for its infrastructure and has final approval of the design. You can pick who installs the chargers.
  • Easement: Georgia Power may require one, because it owns the equipment on your lot.

Worked example 1: an 8-port Level 2 hotel project in Savannah

Take an 8-port Level 2 project at a hotel near the Historic District or the airport, budgeted at $80,000 all-in. Make Ready pays for infrastructure, not hardware. For illustration we assume the chargers, bollards and signage are $24,800 of that budget. That’s our planning assumption, not a Georgia Power figure, and your quotes will differ.

Line itemAmount
Total project budget$80,000
Hotel buys chargers, bollards, signage (assumed)$24,800
Make Ready infrastructure (Georgia Power builds and owns)up to $55,200
Share covered by Make Readyup to 69%
Hotel’s out-of-pocketabout $24,800

That 69% is an upper bound. You’d still pay for electricity, networking, repairs and payment processing over the life of the chargers. If you skip Make Ready and use the Charger Plus rebate instead, the most you can get is $30,000, or 37.5% of an $80,000 project.

We install Level 2 too, and this is the kind of case where it works: incentives cover most of the cost, and the property wants overnight charging for guests. If you’re weighing it, send us your hotel’s address and we’ll tell you whether Level 2, hosted Level 3, or both make sense. Most hotels near I-95 or I-16 get more out of hosted fast charging, because it costs $0 and pays rent.

Worked example 2: a 4-stall DC fast site

Now a commercial site with four 150 kW DC fast chargers at about $894,000 all-in, the kind of build that suits a busy retail center off Abercorn Street or near the I-95 interchanges.

Line itemAmount
Total project budget$894,000
Make Ready infrastructure (cap)up to $300,000
Owner’s remaining costabout $594,000 or more
Share covered by Make Readyabout 34%

Anything over the $300,000 cap may require a Contribution in Aid of Construction from you. After opening, the Charge It rider helps with demand charges, which are the main reason fast-charging power bills spike at low usage. Here’s the schedule from the tariff:

Billing yearBillsBilling demand factor
Year 11-120.20 (you’re billed on 20% of demand)
Year 213-240.40
Year 325-360.60
Year 437-480.80

The discount ends early once your rolling 12-month load factor reaches 15%. It’s a real help, but it doesn’t change the up-front check: the owner still funds most of the $894,000 and carries the operating risk. Our Level 3 charging station installation cost guide breaks down where that money goes.

How much public charging does Savannah have today?

Less fast charging than you might expect for a city with this much visitor traffic. We pulled the U.S. Department of Energy’s Alternative Fuels Data Center station data on Oct. 28, 2026, counting open, public stations with a Savannah address.

AreaPublic locationsLevel 2 portsDC fast portsLocations with DC fast
Savannah651612911
Atlanta7552,15219444
Georgia statewide2,4015,2502,362n/a

Savannah has about 11 places to fast charge inside city addresses. For a property owner, that’s the opening: drivers coming off I-95 or staying downtown have few fast options, and a well-placed 4-stall site can capture them. Counts change weekly, so treat these as a snapshot.

Applying yourself vs. hosting fast chargers with us

Georgia Power’s own criteria spell out a path most owners miss. A charging company can apply for Make Ready on your property, with a letter from you approving the site and the easement. That’s how we work. We take the application, the equipment cost and the operating risk.

Apply for Georgia Power programs yourselfHost Level 3 chargers with us
Up-front cost (4 fast stalls)About $594,000+ after Make Ready$0
Who buys the chargersYouWe do
Electricity, demand charges, sales taxYouWe do
Maintenance, damage, uptimeYouWe do, with a 99%+ uptime standard
Your incomeCharging revenue minus all costsMonthly stall rent or a profit share
TermEquipment life10-15 year agreement
SpaceYour choiceAbout 5 spaces: 4 stalls, expandable to 8

Our fast chargers deliver up to 500 kW, most sessions take 20 to 30 minutes, and our sites average 10+ sessions per charger per day. For a Savannah retail center or restaurant pad, that’s 40+ visits a day from a 4-charger site. If your property is busy and visible, submit it for a no-cost qualification check. For more on how hosting deals are structured, see our EV charging station land lease guide.

Steps to apply for Georgia Power Make Ready

  1. Gather your Georgia Power account number and site address.
  2. Confirm the chargers will be public and you’ll have 6+ Level 2 ports or a DC fast charger.
  3. Submit the online pre-approval application on the Make Ready page.
  4. Georgia Power reviews eligibility and schedules a site visit.
  5. Georgia Power designs and builds the infrastructure with its chosen contractor.
  6. You install the chargers and set up a separately metered account if you want the Charge It or TOU-EVC rates.

If you’d rather skip steps 3 through 6, a hosting partner handles them. Our Georgia Power Make Ready program guide covers the full process and site rules.

Frequently asked questions

Does Georgia Power pay for EV chargers for businesses?

Not the chargers themselves. The Make Ready program builds and owns the electrical infrastructure up to the charger, up to $300,000 per qualifying public project. The Business EV Charger Plus Rebate pays $250/kW for Level 2 or $150/kW for DC fast, up to $30,000 per project and 50% of cost.

How long is Georgia Power’s Make Ready program available?

Georgia Power says Make Ready is scheduled to run until Dec. 31, 2028, or until the funding threshold is met. Funding is limited and first-come, first-served, so apply early.

Can a Savannah hotel use Make Ready for guest-only chargers?

No. Georgia Power’s criteria say hospitality chargers qualify only if they’re in an area the general public may access. Restricted chargers aren’t eligible, though the Charger Plus rebate may still apply.

What is the Georgia Power Charge It rider?

It’s an EV rate rider (CIEV-1) for separately metered charging. It bills demand at 20% in year 1, 40% in year 2, 60% in year 3 and 80% in year 4, or until the site’s rolling 12-month load factor reaches 15%.

Can I get fast chargers in Georgia without paying for them?

Yes, by hosting. We install Level 3 fast chargers at $0 cost to qualified commercial properties, handle the utility programs, power and maintenance, and pay you stall rent or a profit share over a 10-15 year agreement.