A public DC fast charger that runs about 10 sessions a day grosses roughly $6,200 a month at 2026 average prices, or about $24,800 a month for a 4-charger site, before any costs. That figure comes from three public numbers: about 38 kWh per session at federally funded chargers, a national average fast-charging price of about $0.54 per kWh, and 10 sessions per charger per day, which is what our sites average. Electricity, utility demand charges, software, payment fees, repairs and insurance all come out of that gross.

A Level 2 charger makes far less per port, because it delivers much less energy per hour. And if you’re a property owner, the more useful question is usually what you make. When we install Level 3 chargers at $0 to you, we take on the costs and the risk, and you earn monthly stall rent or a share of net charging revenue. Check if your property qualifies to get a site-specific number.

The 3 numbers that decide how much an EV charging station makes

Revenue for a fast charger is simple multiplication: sessions per day × kWh per session × price per kWh.

  • kWh per session: about 38. The Joint Office of Energy and Transportation reports that federally funded charging ports served 730,000 sessions and 27.6 million kWh through September 2026 (EV-ChART impact data). That works out to about 37.8 kWh per session.
  • Price: about $0.54 per kWh. An independent Q3 2026 U.S. fast-charging industry report put the national average price at $0.540 per kWh (Q3 2026 U.S. EV fast-charging report). Peak time-of-use prices averaged $0.637 and off-peak $0.438.
  • Sessions per day: the variable that matters most. Location drives it. The same report found national fast-charger utilization of 15.9%, but 21.1% in the top 30 metros versus 11.0% everywhere else. Our sites average about 10 or more sessions per charger per day.

Price and kWh per session don’t move much from site to site. Sessions per day can double or halve revenue, which is why site selection is most of the game.

Revenue per fast charger at 5, 10 and 15 sessions a day

Here’s the math using 37.8 kWh per session, $0.54 per kWh and 30.4 days per month. These are gross revenue estimates, not profit.

Sessions per charger per daykWh per dayGross revenue per dayGross per month (1 charger)Gross per month (4-charger site)
5189$102about $3,100about $12,400
10378$204about $6,200about $24,800
15567$306about $9,300about $37,200

A 4-charger site at 10 sessions per charger is 40 visits a day. Our top locations reach 80 or more visits a day.

What comes out of that revenue

Gross revenue isn’t what an owner keeps. These are the main costs for a fast-charging station:

  • Electricity. The U.S. average commercial electricity price was 14.47 cents per kWh in August 2026, according to the EIA’s Electric Power Monthly. At 378 kWh a day, that’s about $55 a day, or roughly $1,660 a month per charger, before demand charges. Your state’s rate may be much higher or lower.
  • Demand charges. Many commercial rates also bill for your highest power draw in the month, not just the energy used. A fast charger pulling 150 kW or more can drive a large demand charge even in a slow month, which is why low-use fast chargers often lose money.
  • Network software, payment processing and driver support. Someone has to run the app, take payments and answer the phone at 2 a.m.
  • Maintenance, repairs and damage. Fast chargers are heavy equipment in a parking lot. Federal rules for NEVI-funded stations require average annual uptime above 97% per port (23 CFR 680.116), and hitting that takes paid service.
  • Sales tax administration, insurance and the capital itself. In our model, a 4-stall, 150 kW site costs about $894,000 all-in to build. That capital has to be repaid before the station is truly profitable.

How much does the property owner make?

That depends on who owns the chargers.

You buy and run the chargersYou host, we own and run them
Upfront costThe full project (about $894K in our 4 × 150 kW model)$0
Electricity and demand chargesYou payWe pay
Maintenance, damage, uptimeYour responsibilityWe handle it, 99%+ uptime standard
Sales tax on chargingYou collect and remitWe handle it
Your incomeCharging revenue minus every cost aboveGuaranteed stall rent or a fixed % of net revenue
Risk if traffic is slowYoursOurs

Hosting income varies by market, traffic and power. For one public example, a Culver City staff report shows a charging operator agreeing to pay $720 a month for six spaces, or $120 per space per month, with a 1% annual escalation. We quote each site individually, and you choose between two models:

  • Stall rent: a guaranteed monthly payment for the spaces, no matter how many cars charge.
  • Profit share: a fixed percentage of net charging revenue, so your income grows as utilization grows.

Either way, agreements run 10 to 15 years, and the income adds to your property’s net operating income. We explain that link in do EV chargers increase property value?

What about Level 2 chargers?

Level 2 chargers deliver much less power, so each port sells far less energy per hour and earns less per port. They fit places where cars park for hours, such as hotels, offices and apartments. We install Level 2 too, but it requires owner money, and it usually pencils out best where utility or state incentives cover roughly 60 to 70% or more of the cost. For hotels, see our guide to hotels with electric car charging.

Which properties make the most from EV charging?

The math above shows why we’re picky. Fast chargers make money where drivers already go and stay 20 to 30 minutes: grocery-anchored and big-box shopping centers, restaurants, convenience stores and busy mixed-use sites in dense suburban or urban areas. The utilization gap between big metros and everywhere else (21.1% vs. 11.0%) is the same reason rural sites and thin trade areas usually don’t qualify.

A quick self-check before you submit:

  • Do you have about 5 parking spaces in a visible corner of the lot (4 stalls plus an equipment area)?
  • Is the site open or accessible 24/7?
  • Is there a busy road and a dense trade area around you?
  • Is there no fast charging right next door already?
  • Do you control the parking area, or can you get landlord or tenant consent?

If you answered yes to most of these, read our full property self-check or skip straight to the free review. Submit your property for a free qualification check and we’ll screen it for nearby fast chargers, traffic, trade-area density and power availability. To compare the different ways companies set up these deals, see our earlier guide to EV charging installation companies.

Frequently asked questions

How much does one EV charging station make per month?

A public DC fast charger running about 10 sessions a day grosses roughly $6,200 a month at 2026 average prices (about 38 kWh per session at $0.54 per kWh). That’s before electricity, demand charges, software, repairs and the cost of the equipment.

Are EV charging stations profitable?

They can be when utilization is high. Fast chargers carry high fixed costs, including demand charges, so a busy, well-located station can be profitable while a quiet one can lose money. Location and sessions per day matter most.

How much does a property owner make hosting EV chargers?

It depends on the market and the site. With us, you invest $0 and choose guaranteed monthly stall rent or a fixed percentage of net charging revenue. One public example, a Culver City lease, pays $120 per space per month with a 1% annual escalation.

How many charging sessions does a fast charger get per day?

It varies widely by location. National fast-charger utilization was 15.9% in Q3 2026, and ports in the top 30 metros ran about twice as busy as the rest of the country. Our sites average about 10 or more sessions per charger per day.

Who pays for electricity at a hosted EV charging station?

With us, we do. We collect the charging revenue, pay for the power and handle sales tax collection and remittance, so the property owner has no utility bill or tax work tied to the chargers.

Do Level 2 chargers make as much as fast chargers?

No. Level 2 delivers much less energy per hour, so it earns much less per port. It suits long-dwell sites like hotels and offices, and it usually makes the most sense when incentives cover 60 to 70% or more of the cost.