National Grid EV Charger Rebate 2026: What’s Still Open for Businesses in Massachusetts and Upstate New York (Worcester, Albany, Buffalo)

National Grid’s EV charger rebate for businesses is still open in Massachusetts but closed or paused in upstate New York. In Massachusetts, the public program can cover up to 100% of customer-side wiring, capped at $7,900 per Level 2 port ($10,000 with new service) or $60,000 per 150 kW+ fast port, plus utility-side work and some charger rebates. You need a signed Pre-Approval Offer Letter by Dec. 31, 2026 to lock in today’s incentives. In upstate New York, National Grid stopped taking Level 2 and DC fast make-ready applications on April 3, 2026, and the statewide DC fast program is paused until regulators approve a reopening.

So the window is short in Massachusetts and shut for now in New York. Either way, a four-stall fast site still leaves the owner with most of the bill. We fund, install and operate Level 3 fast chargers at $0 to the property owner and pay monthly stall rent or a profit share. Check if your property qualifies for free EV chargers.

National Grid EV programs for businesses, by state (Nov. 4, 2026)

StateProgramStatus
MassachusettsPublic/Workplace EV Charging Program (Level 2 and DC fast)Accepting applications as funding allows; signed Pre-Approval Offer Letter due by Dec. 31, 2026
Upstate New YorkEV Make-Ready Program, Level 2Closed to new applications
Upstate New YorkEV Make-Ready Program, DC fastPaused pending state approval to reopen
Upstate New YorkMedium- and Heavy-Duty Make-Ready PilotOpen for eligible fleets
Upstate New YorkEV Phase-In RateAvailable on eligible demand-rate charging accounts
Rhode IslandNone from National GridRhode Island’s electric utility is now Rhode Island Energy, not National Grid

Massachusetts: what the National Grid program pays

These figures come from National Grid’s Massachusetts Public/Workplace incentive chart, effective Nov. 15, 2025 (DC fast charger rebates apply to applications with a commitment letter after Oct. 17, 2025). Per the chart, “EJC” means a state-designated Environmental Justice Community.

IncentivePublic Level 2Public DC fast
Utility-side infrastructureUp to 100%Up to 100%
Customer-side infrastructureUp to 100%, capped at $7,900 per port ($10,000 if new service)Up to 100%, capped at $30,000 per 50-149 kW port or $60,000 per 150 kW+ port
Charger rebate, EJC meeting income criteriaUp to 100% (ports 1-10), up to $3,900 per portUp to 25%, up to $10,000 (50-149 kW) or $20,000 (150 kW+) per port
Charger rebate, other EJCUp to 75% (ports 1-10), up to $2,925 per portSame as above
Charger rebate, not in an EJCUp to 50%, ports 5-10 only (non-municipal), up to $1,950 per portNone
Networking$480 per port ($120 a year for 4 years)Not listed
Site cap on charger rebatesNot listed$100,000
Workplace (non-public)Infrastructure only; no charger or networking rebatesNot offered on the chart

“Public” has a specific meaning here. Chargers must be open to the general public 24 hours a day, 7 days a week. If the site has access restrictions, you can cut that to no less than 12 hours a day, 7 days a week. Chargers must be on the Massachusetts tab of EPRI’s Vetted Product List, networking is required, and past participants may not qualify for charger and networking rebates.

The deadline matters most. National Grid’s Public/Workplace program page says you need a signed Pre-Approval Offer Letter returned by Dec. 31, 2026 to keep the current incentives, and approval isn’t guaranteed. Massachusetts regulators already cut Eversource’s fast-charger rebates for the current cycle, which we cover in our Eversource EV charger rebate guide. The next cycle will have its own rules.

Worked example: an 8-port hotel Level 2 project in Worcester

A hotel near I-290 budgets $80,000 for 8 public Level 2 ports, not in an EJC. For illustration, we assume $24,800 of the budget is chargers, bollards and signage and $55,200 is wiring and infrastructure. That split is our planning assumption, not a National Grid number.

IncentiveUp to
Customer-side infrastructure (cap 8 x $7,900 = $63,200)$55,200 (the full assumed wiring cost)
Charger rebate, ports 5-8 only (4 x $1,950)$7,800
Networking (8 x $480, paid over 4 years)$3,840
TotalUp to $66,840 (84%)
Hotel’s shareAbout $13,160

That’s the kind of Level 2 project we’re glad to install, because incentives can cover most of the cost. It only works if the letter is signed by Dec. 31 and the chargers stay public. To check whether your hotel fits, submit your property. Our hotel EV charger installation guide covers guest-side planning.

Worked example: a 4-stall DC fast site in Worcester

Four 150 kW DC fast chargers at a busy retail center, about $894,000 all-in:

Line itemNot in an EJCIn an EJC
Customer-side infrastructure (4 x $60,000 cap)Up to $240,000Up to $240,000
Charger rebate (25%, up to $20,000 per port)$0Up to $80,000
Utility-side infrastructureUp to 100% of the utility-side cost (site-specific)Same
Known incentivesUp to $240,000 (27%)Up to $320,000 (36%)
Owner’s remaining cost, before utility-side helpAbout $654,000About $574,000

Even in the best case, the owner funds well over half a million dollars and carries electricity, demand charges, repairs and utilization risk for the life of the site. Our Level 3 charging station installation cost guide breaks down that budget.

Upstate New York: why the make-ready program stopped

National Grid’s upstate New York commercial EV page says that as of April 3, 2026, it’s “no longer accepting applications for the Level 2 or DCFC Make-Ready Program.” The statewide Joint Utilities participant guide (updated Oct. 19, 2026) explains why. A March 23, 2026 Public Service Commission order ended new Level 2 applications and paused DC fast “until certain reporting requirements are met.” When DC fast reopens, developers must meet a 90% data-reporting threshold and use approved contractors.

When it was open, the program paid up to 90% of make-ready costs for public Level 2 and DC fast sites, and up to 100% for public DC fast sites in Disadvantaged Communities. It never paid for the chargers themselves. A September 2026 order also classified the J3400 connector as non-proprietary for new applications.

What’s still available in upstate New York:

  • EV Phase-In Rate: an optional commercial rate for charging accounts on SC-2D, SC-3 or SC-3A that swaps part of the demand charge for time-of-use energy charges.
  • Medium- and Heavy-Duty Make-Ready Pilot: up to 50% of customer-side and 90% of grid-side costs for eligible truck and bus fleets.
  • Load Management Technologies Incentive Program: up to 100% of load-management software and hardware and up to 60% of energy storage. National Grid says it applies alongside a Make-Ready application, so ask its EV team about standalone projects.

Where fast charging is thin in National Grid cities

We pulled open, public charging stations from the U.S. Department of Energy’s Alternative Fuels Data Center (AFDC) station API on Nov. 4, 2026, matched by city name. These are rough counts:

CityPublic locationsLevel 2 portsDC fast portsSites with DC fastSites with 4+ fast ports
Worcester, MA1593872474
Brockton, MA3575411
Lowell, MA711382233
Albany, NY20566759197
Buffalo, NY17342528114
Saratoga Springs, NY761811232

Worcester has 387 public Level 2 ports but just 24 fast ports. Buffalo has 425 Level 2 ports and 28 fast ports. Brockton has one fast-charging site. That’s a fast-charging gap, and busy retail, grocery and restaurant properties there are the sites we screen first.

Rebate yourself vs. host for $0

Apply yourselfHost our fast chargers
Up-front cost (4 fast stalls)About $574,000 to $654,000 in MA after known incentives; most of $894,000 in upstate NY now$0
DeadlinesMA letter by Dec. 31, 2026; NY DC fast pausedWe handle utility coordination and permitting
Electricity and demand chargesYouWe pay
Maintenance and damageYouWe handle, with a 99%+ uptime standard
IncomeCharging margin, if utilization is high enoughMonthly stall rent or profit share
TermEquipment life10 to 15 years

Hosting needs about 5 parking spaces: 4 stalls, expandable to 8, plus an equipment area. We install Level 3 chargers up to 500 kW, so most sessions take 20 to 30 minutes, and our sites average 10+ sessions per charger per day. We also handle sales tax on charging. Read how hosting works, or submit your Massachusetts or New York property for a free fast-charger review.

Frequently asked questions

Does National Grid offer EV charger rebates for businesses in 2026?

In Massachusetts, yes. The Public/Workplace program pays for most wiring costs and some charger costs, with a signed Pre-Approval Offer Letter due by Dec. 31, 2026. In upstate New York, Level 2 make-ready closed and DC fast is paused as of April 2026.

How much does National Grid pay for a public DC fast charger in Massachusetts?

Up to 100% of customer-side infrastructure, capped at $60,000 per 150 kW+ port ($30,000 for 50-149 kW), plus up to 100% of utility-side work. Charger rebates of up to 25% ($20,000 per 150 kW+ port, $100,000 per site) apply only in Environmental Justice Communities.

How much does National Grid pay for Level 2 chargers at a hotel in Massachusetts?

If the chargers are public, up to 100% of customer-side wiring (up to $7,900 per port, or $10,000 with new service), plus charger rebates and $480 per port in networking. Outside EJCs, charger rebates only apply to ports 5 through 10, at up to $1,950 per port.

Is the National Grid Make-Ready Program open in New York?

Not for new light-duty projects. National Grid stopped accepting Level 2 and DC fast make-ready applications on April 3, 2026. The statewide DC fast program is paused until regulators approve a reopening. The medium- and heavy-duty fleet pilot is still open.

Does National Grid still serve Rhode Island?

No. Rhode Island’s electric utility is now Rhode Island Energy. Rhode Island businesses should check Rhode Island Energy’s programs, not National Grid’s.

Can I get fast chargers in National Grid territory without paying for them?

Yes, if your property qualifies. We fund, install and operate Level 3 fast chargers at $0 to the owner, pay monthly stall rent or a profit share for 10 to 15 years, and cover electricity, maintenance and damage.