Pacific Power EV Charger Rebate: Free EV Chargers for Oregon Hotels and Businesses
Pacific Power’s Oregon EV charger rebate pays 75% of qualified costs, up to $3,500 per standard Level 2 port, and up to $15,000 per DC fast port under 150 kW or $30,000 per DC fast port at 150 kW and above. Small businesses and multifamily properties can get 100% of qualified costs, up to $4,500 per Level 2 port. The maximum is $100,000 per site unless Pacific Power pre-approves more, according to Pacific Power’s Oregon EV charger incentives page.
You can stack it with ODOT’s Community Charging Rebates, which pay up to $8,000 per Level 2 port or $80,000 per DC fast port. Together they can cover most of a hotel Level 2 project. A fast-charging project still leaves the owner paying well over half a million dollars, which is why many Oregon property owners host instead. We install Level 3 fast chargers at $0 cost to qualified commercial properties. Submit your Oregon property for a free qualification check.
How much is the Pacific Power EV charger rebate?
Pacific Power pays a percentage of qualified costs up to a per-port cap. Final invoices are required, so it’s a reimbursement after you build, not an upfront grant.
| Charger type | Rebate | Per-port cap |
|---|---|---|
| Standard AC Level 2 | 75% of qualified costs | $3,500 |
| AC Level 2, small business or multifamily | 100% of qualified costs | $4,500 |
| DC fast, under 150 kW per port | 75% of qualified costs | $15,000 |
| DC fast, 150 kW per port or more | 75% of qualified costs | $30,000 |
| Site maximum | $100,000 (more needs pre-approval) |
Source: Pacific Power, Oregon rebates for EV chargers. Pacific Power defines a small business as a facility under 20,000 square feet or with 20 or fewer employees at the charger location. Most full-service hotels won’t fit that definition, so plan on the standard $3,500 tier.
Who qualifies for Pacific Power EV charger rebates?
You qualify if you’re a Pacific Power customer in Oregon installing chargers behind a non-residential meter, using equipment from Pacific Power’s approved list. That covers hotels, retail centers, offices and multifamily buildings with three or more units in Pacific Power territory. In Oregon, that includes Bend, Medford, Ashland, Klamath Falls, Albany, Corvallis, Hood River, Pendleton and Coos Bay.
The rules that trip people up:
- Apply within one year of purchase. You submit after installation with a March 2024 W-9, a data release agreement, itemized final invoices (quotes aren’t accepted), installation photos, nameplate photos showing each serial number, and permit photos.
- One incentive per site. Pacific Power says customers can apply for only one incentive per site, so a Fleet Make-Ready participant can’t also take this rebate. You can claim Level 2 and DC fast incentives on the same project.
- Dual-port chargers count twice only if both ports charge at once. A two-cord unit that charges one car at a time is a single port.
- Keep it running. The participation agreement requires equipment to stay operational for at least 3 years.
One timing note. The current agreement says the program runs first-come, first-served from Jan. 1, 2026 through Dec. 31, 2026, while funding lasts. It sits inside Pacific Power’s 2026–2028 Transportation Electrification Plan, but 2027 terms weren’t posted when we checked on Oct. 21, 2026. Pacific Power’s page also says plainly: “Act now. Funds are limited.”
Can you stack Pacific Power with ODOT Community Charging Rebates?
Yes. ODOT’s Community Charging Rebates (CCR) Round 5 opened Oct. 1, 2026 with about $5.5 million. It pays $8,000 per Level 2 port or $80,000 per DC fast port, or 80% of eligible costs (95% in ten priority counties), whichever is lower. The Round 5 guidelines say CCR “may be combined with other state, local agency, or utility incentives.” The guidelines also set the stacking rules:
- Apply for the utility rebate first. Other incentives reduce the eligible project cost that CCR calculates from.
- The cap is $249,000 per project site across Rounds 4 and 5, and $1 million per entity.
- No other federal money. Chargers at a NEVI-funded station aren’t eligible.
- All costs must be incurred after Oct. 1, 2026, and the equipment must be purchased, not leased.
- You need a 5-year maintenance contract and 5 years of networking, both paid in advance.
Hotels count as publicly accessible sites under CCR if the chargers are open to the public at least 60 hours a week. If you restrict charging to guests and staff, ODOT reclassifies the project as workplace charging.
The money is thinner than the headline. ODOT’s funding tracker shows only $96,000 for Level 2 in non-priority areas and $152,000 in each priority Level 2 bucket. DC fast charging gets $960,000 in non-priority areas, $1.76 million in the ten priority counties and $2.32 million in other priority areas. Klamath County is one of the ten. Its reserved funds hold until Jan. 31, 2027, then roll into the statewide pool. When the money runs out, new applicants go on a waitlist.
Worked example 1: an 8-port hotel Level 2 project in Bend
Take an 8-port Level 2 project at a Bend hotel costing $80,000 all-in, or $10,000 per port. Assume standard (not small-business) rates and a non-priority location.
| Line item | Math | Amount |
|---|---|---|
| Project cost | 8 ports × $10,000 | $80,000 |
| Pacific Power rebate | 75% would be $60,000, so the $3,500/port cap binds: 8 × $3,500 | $28,000 |
| Eligible cost left for CCR | $80,000 − $28,000 | $52,000 |
| ODOT CCR rebate | 80% × $52,000 = $41,600, below the $64,000 per-port cap | $41,600 |
| Total rebates | $28,000 + $41,600 | $69,600 (87%) |
| Hotel’s net cost | $10,400 |
That’s a strong deal, if the money is there. One 8-port project like this would claim about 43% of CCR’s entire $96,000 non-priority Level 2 pot. Without CCR, Pacific Power alone covers 35% and the hotel pays $52,000. Either way, the hotel still owns the chargers, the electric bill, the network contract and every repair. Own a hotel? Submit your property and we’ll check whether incentives make Level 2 work or whether the site fits a $0 Level 3 host deal.
Worked example 2: a 4 × 150 kW fast-charging site in Medford
Now take a 4-stall, 150 kW DC fast charging site near I-5 in Medford with an all-in budget of about $894,000 ($893,600 in our model). That covers chargers, switchgear, transformer work and installation.
| Line item | Math | Amount |
|---|---|---|
| Project cost | 4 × 150 kW stalls, all-in | $893,600 |
| Pacific Power rebate | 4 × $30,000 = $120,000, but the site max is $100,000 unless pre-approved | $100,000 to $120,000 |
| ODOT CCR rebate | 80% of the remaining cost is far above the $249,000 site cap | $249,000 |
| Total rebates | $349,000 to $369,000 (39% to 41%) | |
| Owner’s net cost | about $525,000 to $545,000 |
Even with both programs, the owner is writing a check for more than half a million dollars. They’d also carry demand charges, a 5-year prepaid service contract and the risk of being a charging operator for a decade. Our Level 3 charging station installation cost guide breaks down where that money goes.
Pacific Power rebate vs. hosting chargers at $0
Here’s how doing it yourself with rebates compares with letting us build and run the station.
| Apply for rebates yourself | Host chargers with us | |
|---|---|---|
| Upfront cost | Full project cost, reimbursed after install | $0 |
| Typical out-of-pocket (examples above) | $10,400 (hotel L2, with CCR) to $525,000+ (4-stall fast site) | $0 |
| Paperwork | Utility application, then CCR, with invoices, photos, W-9s and reporting | We handle utility coordination and permitting |
| Electricity and sales tax | You pay and file | We pay the power and handle sales tax |
| Repairs, damage and uptime | You, under a 5-year prepaid service contract | We do, with a 99%+ uptime standard |
| How you earn | Charging revenue minus your costs | Guaranteed stall rent or a profit share |
| Charger type | Your choice (usually Level 2 for hotels) | Level 3 DC fast, up to 500 kW |
| Space | Depends on design | About 5 spaces (4 stalls, expandable to 8) |
There’s an honest split here. If you want slow overnight charging for hotel guests, the rebate route is built for you. We install Level 2 too, but it’s owner-funded, so it makes the most sense when incentives cover most of the cost, roughly 60 to 70% or more. If you have a busy corner of a lot near I-5, US-97 or I-84 where drivers would stop for 20 to 30 minutes, Level 3 fast charging is the bigger opportunity, and it’s the one we fund: $0 to you, plus monthly stall rent. Agreements run 10 to 15 years, and our sites average 10+ sessions per charger per day.
Which Oregon properties in Pacific Power territory fit fast charging?
The best fits are busy, amenity-rich sites where a driver happily spends 20 to 30 minutes. Think grocery-anchored and big-box centers, restaurant pads, and hotels with restaurants or retail next door. Good examples are Bend’s US-97 and Third Street corridor, Medford’s Crater Lake Highway and I-5 interchanges, and Albany and Corvallis along I-5 and US-20. Rural sites with thin trade areas generally don’t qualify. Our post on EV charging station requirements walks through the site checklist, and our hotel EV charging guide covers what guests expect.
How to apply for the Pacific Power rebate (if you build it yourself)
- Confirm you’re on a Pacific Power non-residential account in Oregon. Pacific Power also offers free onsite technical assistance.
- Pick chargers from Pacific Power’s approved product list. For CCR, also check ODOT’s Round 5 qualified charger list.
- Check ODOT’s priority locator map for your address. Then reserve CCR funds early, because it’s first-come, first-served.
- Install, then submit to Pacific Power within one year of purchase with final invoices and photos. Email PacificPowerEV@clearesult.com with questions.
- File the CCR post-installation application, listing your Pacific Power rebate.
Or skip all five steps. Send us your property address and parking count. We’ll screen it for traffic, nearby fast chargers, trade-area density and power, and qualified sites get a no-cost proposal and letter of intent.
Frequently asked questions
Does Pacific Power offer a rebate for commercial EV chargers in Oregon?
Yes. Pacific Power pays 75% of qualified costs up to $3,500 per standard Level 2 port, up to $15,000 per DC fast port under 150 kW, and up to $30,000 per DC fast port at 150 kW or more. Small businesses and multifamily properties get 100% up to $4,500 per Level 2 port. The site maximum is $100,000 unless pre-approved.
Can a hotel get the Pacific Power EV charger rebate?
Yes, if the hotel is a Pacific Power customer in Oregon installing approved chargers behind a non-residential meter. Most hotels fall under the standard Level 2 tier of 75% up to $3,500 per port. The small-business tier applies only to facilities under 20,000 square feet or with 20 or fewer employees on site.
Can I combine Pacific Power and ODOT Community Charging Rebates?
Yes. ODOT’s Round 5 guidelines allow stacking with utility incentives, but you must apply for the utility rebate first, and it reduces the eligible cost ODOT calculates from. CCR pays up to $8,000 per Level 2 port or $80,000 per DC fast port, capped at $249,000 per site.
How long is the Pacific Power EV charger rebate available?
The current participation agreement runs first-come, first-served from Jan. 1 through Dec. 31, 2026, while funding lasts. The rebate is part of Pacific Power’s 2026–2028 Transportation Electrification Plan, but check Pacific Power’s site for 2027 terms before you budget.
Is there a way to get EV chargers in Oregon without paying anything?
Yes. We fund 100% of equipment, installation, utility coordination and permitting for Level 3 fast chargers at qualified commercial properties. We own and maintain the station, pay for electricity, and pay you stall rent or a profit share over a 10 to 15 year term.