Pacific Power EV Charging for Oregon Businesses: Every 2026 Program, Stacked With ODOT (Hood River, Corvallis, Roseburg)
Pacific Power’s main EV charging program for Oregon businesses is its charger rebate: 75% of qualified costs up to $3,500 per Level 2 port (100% up to $4,500 for small businesses and multifamily), and 75% up to $15,000 or $30,000 per DC fast port, with a $100,000 maximum per site unless pre-approved. It also offers free on-site technical assistance, grant matching support, and a separate Fleet Make-Ready program. Its 2026 electric mobility grant window is closed. You can stack the rebate with ODOT’s Community Charging Rebates, which pays up to $8,000 per Level 2 port and $80,000 per fast port, capped at $249,000 per site.
Stacked, those programs can cover most of a hotel’s Level 2 project. On a four-stall fast-charging site, they still leave the owner with more than half a million dollars to fund. That’s the gap we fill. We fund, install and operate Level 3 fast chargers at $0 to the property owner and pay monthly stall rent or a profit share. Check if your Oregon property qualifies for free EV chargers.
Every Pacific Power EV charging program for businesses, and its status
We checked each program on Pacific Power’s and ODOT’s sites on Nov. 4, 2026:
| Program | What it does | Status (Nov. 4, 2026) |
|---|---|---|
| Business charger rebates | Per-port rebate after installation; $100,000 per site max | Open; “Act now. Funds are limited.” |
| Technical assistance | Free on-site feasibility visit covering equipment, costs, rates and incentives | Open to nonresidential Oregon customers |
| Electric mobility grants | Grants for EV charging and EVs in underserved communities | 2026 application period closed |
| Grant matching support | Matching funds for a project funded by another grant | Listed as available; application on the grants page |
| Fleet Make-Ready | Infrastructure upgrades for fleet electrification | Open year-round, but excludes the charger rebate at the same site |
| ODOT Community Charging Rebates (Round 5) | State rebate; stacks with Pacific Power | Open since Oct. 1, 2026, first-come, first-served, no deadline |
One rule surprises people: Pacific Power says customers “can only apply for one incentive per site.” If you use Fleet Make-Ready at a location, you can’t also take the charger rebate there. You can, however, claim Level 2 and DC fast rebates on the same project.
How much is the Pacific Power EV charger rebate?
Here are the rates from Pacific Power’s Oregon business charger rebate page:
| Charger type | Rebate |
|---|---|
| Standard Level 2 | 75% of qualified costs, up to $3,500 per port |
| Level 2 for small businesses and multifamily | 100% of qualified costs, up to $4,500 per port |
| DC fast, under 150 kW per port | 75% of qualified costs, up to $15,000 per port |
| DC fast, 150 kW or more per port | 75% of qualified costs, up to $30,000 per port |
| Per-site maximum | $100,000; requests above that must be pre-approved |
To qualify, you must be a Pacific Power customer in Oregon installing chargers behind a nonresidential meter, and the chargers must be on Pacific Power’s approved product list. A “small business” means under 20,000 square feet or 20 or fewer employees at the charger location. You have one year from purchase to apply, and Pacific Power wants final itemized invoices (quotes aren’t accepted), photos of each charger nameplate and the permits, a March 2024 W-9 and a data release agreement. Rebates are per port, so a dual-port charger that can charge two cars at once may earn two rebates. For the full application walk-through, see our Pacific Power EV charger rebate guide.
How stacking with ODOT works, and the order matters
ODOT’s Round 5 guidelines (revised Oct. 16, 2026) allow you to combine the state rebate with utility incentives, with three catches:
- Apply to Pacific Power first. ODOT says applicants “must apply for other incentives first, prior to applying for ODOT’s rebate,” and must disclose the dual participation.
- The utility rebate shrinks ODOT’s base. Other incentives reduce the eligible project cost that ODOT’s 80% (or 95%) is calculated on.
- No federal double-dipping. CCR can’t be combined with other federal incentives or grants, or with stations funded by the NEVI formula program.
ODOT pays the lower of $8,000 per Level 2 port or $80,000 per fast port, or 80% of eligible costs (95% in 10 reserved counties), with a $249,000 limit per site across Rounds 4 and 5. Funding is tight for Level 2: ODOT’s tracker lists $96,000 for non-priority Level 2 projects and $152,000 for each priority Level 2 bucket, against $960,000 to $2.32 million per fast-charging bucket. Hood River, Benton (Corvallis) and Douglas (Roseburg) aren’t among the 10 reserved counties, so the 80% limit applies. Whether a site falls in a “priority community” depends on ODOT’s locator map. Our ODOT Community Charging Rebates guide covers the buckets in detail.
Worked example: an 8-port hotel Level 2 project in Hood River
Take an $80,000, 8-port Level 2 project at a Hood River hotel, open to the public.
| Step | Standard rebate | Small-business rebate |
|---|---|---|
| Project cost | $80,000 | $80,000 |
| Pacific Power rebate (8 ports) | $28,000 ($3,500 x 8) | $36,000 ($4,500 x 8) |
| ODOT eligible cost after the utility rebate | $52,000 | $44,000 |
| ODOT rebate (lower of $64,000 or 80%) | $41,600 | $35,200 |
| Total incentives | $69,600 (87%) | $71,200 (89%) |
| Hotel’s share | $10,400 | $8,800 |
That’s the kind of Level 2 project we’re happy to install, because incentives cover most of the cost. The risk is timing. Pacific Power says funds are limited, and ODOT’s non-priority Level 2 bucket is only $96,000, enough for about two projects like this one. If you want us to check whether your hotel still clears the bar, submit your property. Our hotel EV charger installation guide covers guest-side planning.
Worked example: a 4-stall DC fast site on I-5 in Roseburg
Now take four 150 kW DC fast chargers at a busy center near an I-5 exit, about $894,000 all-in:
| Step | Amount |
|---|---|
| Project cost | $894,000 |
| Pacific Power rebate: 4 x $30,000 = $120,000, capped at the $100,000 site max | $100,000 |
| ODOT eligible cost after the utility rebate | $794,000 |
| ODOT rebate: lower of $320,000 (4 x $80,000), 80% of $794,000, or the $249,000 site cap | $249,000 |
| Total incentives | $349,000 (39%) |
| Owner’s share | About $545,000 |
If Pacific Power pre-approves the full $120,000, the total reaches $369,000 (41%) and the owner still funds about $525,000. On top of that, the owner pays for electricity, networking, repairs and payment processing for the life of the chargers. Our Level 3 charging station installation cost guide breaks down that budget.
Where fast charging is thin in Pacific Power country
We pulled open, public charging stations from the U.S. Department of Energy’s Alternative Fuels Data Center (AFDC) station API on Nov. 4, 2026, matched by city name in the station address. These are rough counts:
| City | Public locations | Level 2 ports | DC fast ports | Sites with DC fast | Sites with 4+ fast ports |
|---|---|---|---|---|---|
| Hood River | 19 | 30 | 32 | 4 | 4 |
| Corvallis | 31 | 62 | 5 | 2 | 1 |
| Albany | 14 | 16 | 24 | 6 | 2 |
| Roseburg | 22 | 37 | 7 | 2 | 1 |
| Grants Pass | 16 | 22 | 31 | 5 | 3 |
Corvallis and Roseburg stand out. Each has just two fast-charging sites and seven or fewer fast ports, even though Corvallis is a college town and Roseburg sits on I-5. A busy grocery-anchored or restaurant property in either city is the kind of site we screen first. For the statewide picture, read our Oregon EV charger rebate guide.
Rebate yourself vs. host for $0
| Apply for rebates yourself | Host our fast chargers | |
|---|---|---|
| Up-front cost (4 fast stalls) | About $525,000 to $545,000 after incentives | $0 |
| Who applies for incentives | You, in the right order, with final invoices | We handle utility coordination and permitting |
| Electricity and demand charges | You | We pay |
| Maintenance and damage | You | We handle, with a 99%+ uptime standard |
| Your income | Charging margin, if utilization is high enough | Monthly stall rent or a profit share |
| Term | Equipment life | 10 to 15 years |
Hosting needs about 5 parking spaces: 4 stalls, expandable to 8, plus an equipment area. We install Level 3 chargers up to 500 kW, so most sessions take 20 to 30 minutes, and our sites average 10+ sessions per charger per day. We also handle sales tax on charging. Learn how our EV charging host agreement works, or submit your Oregon property for a free fast-charger review.
Frequently asked questions
What EV charging programs does Pacific Power offer businesses in Oregon?
Business charger rebates, free technical assistance, grant matching support and a Fleet Make-Ready program. The 2026 electric mobility grant window is closed. Pacific Power also points business customers to ODOT’s Community Charging Rebates, which can be stacked with its rebate.
How much is the Pacific Power DC fast charger rebate?
75% of qualified costs, up to $15,000 per port under 150 kW or $30,000 per port at 150 kW or more. The maximum is $100,000 per site, and requests above that must be pre-approved.
Can I combine the Pacific Power rebate with ODOT’s Community Charging Rebates?
Yes. ODOT allows utility incentives to be stacked, but you must apply for them first and disclose them, and they reduce the eligible cost ODOT’s percentage is based on. CCR can’t be combined with other federal funding.
Can I use Fleet Make-Ready and the charger rebate at the same site?
No. Pacific Power says customers can only apply for one incentive per site, so Fleet Make-Ready participants aren’t eligible for the charger rebate at that location. Level 2 and DC fast rebates can be combined on one project.
How much would an 8-port hotel Level 2 project cost after incentives?
On an $80,000 project, Pacific Power’s standard rebate ($28,000) plus ODOT ($41,600) covers $69,600, or 87%, leaving about $10,400. With the small-business rate, coverage rises to about 89%. Both depend on funds still being available.
Can I get fast chargers in Pacific Power territory for free?
Yes, if your property qualifies. We fund, install and operate Level 3 fast chargers at $0 to the owner, pay monthly stall rent or a profit share for 10 to 15 years, and cover electricity, maintenance and damage.