PSE&G EV Charger Rebate: Free EV Chargers for New Jersey Hotels and Commercial Properties
PSE&G’s EV charger rebate is a set of on-bill credits for make-ready work, not a rebate on the chargers themselves. Level 2 Mixed-Use Commercial sites get up to $7,500 per charger for up to four chargers ($30,000 per site), plus up to $10,000 off any utility-side deposit. Public DC fast charging sites get up to $25,000 per charger for up to four chargers ($100,000 per site), plus up to $50,000 off the utility-side deposit and a Demand Charge Rebate. All public funding combined can’t exceed 90% of project cost.
For an 8-port hotel Level 2 project, PSE&G plus NJDEP’s It Pay$ to Plug In grant can cover about three-quarters of the cost. For a 4-stall fast-charging site, PSE&G covers about 17%, which leaves the owner with roughly $744,000 to fund. That gap is why many New Jersey owners host instead. We install Level 3 fast chargers at $0 cost to qualified commercial properties and pay you rent. Submit your New Jersey property for a free qualification check.
How much is the PSE&G EV charger rebate for businesses?
PSE&G splits commercial incentives into two subprograms. Both pay for make-ready work, meaning the panels, switchgear, conduit and wiring that bring power to the charger. You buy the charging units yourself.
| PSE&G subprogram | Behind-the-meter credit | Utility-side deposit reduction | Extras |
|---|---|---|---|
| Level 2 Mixed-Use Commercial | Up to $7,500 per charger, max 4 chargers ($30,000) | Up to $10,000 | None |
| Public DC Fast Charging | Up to $25,000 per charger, max 4 chargers ($100,000) | Up to $50,000 | Demand Charge Rebate (GLP and LPL-S rates, dedicated meter) |
Sources: PSE&G’s EV Commercial Charging Program and EV Public-DCFC Charging Program pages.
The credits post to your PSE&G bill within one to two billing cycles after enrollment. You can apply the credit to your electric bills or call PSE&G for a paper check. PSE&G says the full review can take up to three months.
Who qualifies for PSE&G commercial EV incentives?
You qualify if you’re a PSE&G commercial customer in good standing and use New Jersey-licensed electricians. Level 2 chargers must be ENERGY STAR certified smart chargers. Mixed-Use includes “locations where property owners provide charger access to the public,” which covers most hotels and retail centers.
The requirements differ by subprogram:
- Level 2 public access: chargers open to the public must be available at least during reasonable business hours, which PSE&G says is typically at least eight hours a day, reviewed case by case.
- DC fast public access: chargers must be open to the public 24/7, network-enabled, and have a CCS connector or meet PSE&G’s co-location rules. A site with one CCS charger next to a non-CCS charger gets up to 50% of the maximum. Two or more CCS chargers unlock 100%.
- Data: you must share EV charging data with PSE&G. DC fast sites report at least quarterly.
- Demand Charge Rebate: only for GLP and LPL-S rate customers whose meter serves only DC fast charging and minor ancillary loads like lighting. It draws from a $5 million pool, and PSE&G reports the remaining balance semiannually.
Is the PSE&G EV program still open in 2027?
It’s open now, but on borrowed time. The New Jersey Board of Public Utilities approved PSE&G’s program in January 2021 to run until its allocated funds are used up. On June 22, 2026, PSE&G petitioned to extend it through December 2027, or one year after approval, or until funding is exhausted, with no new money. By its Sept. 9, 2026 order, the BPU retained the petition for hearing. The extension was still pending when we checked on Oct. 21, 2026.
The petition also asks to let NACS (SAE J3400) and Megawatt Charging System chargers qualify without being paired with a CCS charger. Until that’s approved, plan your fast-charging site around CCS.
Can you stack PSE&G with NJDEP It Pay$ to Plug In?
Yes, with a 90% ceiling. PSE&G says you can combine its incentives with state or federal EV programs if you notify both programs. Combined funding can’t exceed 90% of total project cost, and PSE&G trims its own credit if it would.
The NJDEP’s April 2026 incentive summary lists It Pay$ to Plug In at up to $4,000 per Level 2 port, with a 2-port minimum and 20-port maximum per site. NJDEP’s grant FAQ notes the program sometimes sits “between funding sources,” with applications waitlisted first-come, first-served. DC fast grants have run as separate, time-limited solicitations. Check the It Pay$ to Plug In page for current intake before you count on it.
Worked example 1: an 8-port hotel Level 2 project in Jersey City
Take an 8-port Level 2 project at a Jersey City or Newark airport hotel costing $80,000 all-in. We assume four dual-port chargers, so PSE&G counts four chargers, and the site has no utility-side upgrade.
| Line item | Math | Amount |
|---|---|---|
| Project cost | 8 ports | $80,000 |
| PSE&G Level 2 credit | 4 chargers × $7,500 | $30,000 |
| NJDEP It Pay$ to Plug In | 8 ports × $4,000 | $32,000 |
| Total incentives | $62,000, under the 90% cap of $72,000 | $62,000 (77.5%) |
| Hotel’s net cost | $18,000 |
If the hotel installs eight single-port chargers instead, PSE&G still stops at four, so the credit stays $30,000. If the site needs a utility-side upgrade, PSE&G can knock up to $10,000 off that deposit. The hotel still owns the chargers, pays for the electricity and handles repairs. Own a hotel? Submit your property and we’ll check whether incentives make Level 2 work or whether the site fits a $0 Level 3 host deal.
Worked example 2: a 4 × 150 kW fast-charging site in Edison
Now take a 4-stall, 150 kW DC fast charging site on Route 1 in Edison or Woodbridge, with an all-in budget of about $894,000 ($893,600 in our model).
| Line item | Math | Amount |
|---|---|---|
| Project cost | 4 × 150 kW, all-in | $893,600 |
| PSE&G behind-the-meter credit | 4 × $25,000 | $100,000 |
| Utility-side deposit reduction | only if an upgrade deposit is required | up to $50,000 |
| Total PSE&G support | up to $150,000 (about 17%) | |
| Owner’s remaining cost | about $743,600 or more |
The Demand Charge Rebate helps after opening, but PSE&G doesn’t publish a per-site amount. Without a current NJDEP fast-charging solicitation, the owner funds most of the build. Our Level 3 charging station installation cost guide explains where the money goes.
PSE&G rebate vs. hosting chargers at $0
Here’s how doing it yourself compares with letting us build and operate the station.
| Apply for PSE&G and NJDEP yourself | Host chargers with us | |
|---|---|---|
| Upfront cost | Full project cost; credits arrive on your bill later | $0 |
| Typical out-of-pocket (examples above) | about $18K (8-port L2) to about $744K (4-stall DC fast) | $0 |
| Charger hardware | You buy it (PSE&G doesn’t fund chargers) | We buy it |
| Program risk | Pending BPU extension, NJDEP intake windows | Ours, not yours |
| Electricity, demand charges, sales tax | You | We pay the power and handle sales tax |
| Data reporting and uptime | You | We do, with a 99%+ uptime standard |
| How you earn | Charging revenue minus costs | Guaranteed stall rent or a profit share |
| Charger type | Your choice | Level 3 DC fast, up to 500 kW |
| Term | Open-ended ownership | 10 to 15 years |
The honest split: if you want overnight Level 2 for guests and can live with an $18,000 net bill, PSE&G plus NJDEP is a good deal. We install Level 2 too; it’s owner-funded, so it fits best when incentives cover most of the cost, roughly 60 to 70% or more, as they can here. If your property sits on a busy corridor where drivers stop for 20 to 30 minutes, hosted Level 3 fast charging costs you nothing and pays you monthly rent. It uses about 5 spaces, starting with 4 stalls and expandable to 8.
Which New Jersey properties fit hosted fast charging?
The strongest sites are busy, amenity-rich and in dense trade areas. In PSE&G territory, look at grocery-anchored and big-box centers and hotels near food and retail. That includes Newark and Elizabeth near EWR, Jersey City and Hoboken, Secaucus and the Meadowlands, Paramus and Hackensack, Edison and Woodbridge along Route 1 and the Turnpike, and Princeton and Cherry Hill. Atlantic City is served by a different utility. Our sites average 10+ sessions per charger per day, so a 4-charger site brings 40+ visits daily.
For site fit, see our EV charging station requirements guide and hotel EV charging guide. Own property in other utility territories? Compare the Georgia Power Make Ready program and the Pacific Power EV charger rebate.
How to apply for the PSE&G EV charger rebate
- Review PSE&G’s eligibility rules, then apply through the PSE&G EV portal.
- PSE&G emails you that the application is qualified or under review.
- PSE&G engineers check your service, and a New Business representative says whether a utility-side upgrade is needed and what the deposit is, after the make-ready reduction.
- Install with a New Jersey-licensed contractor, then upload invoices, permits and documentation.
- After approval, PSE&G applies the credit to your bill within one to two billing cycles.
Or skip the paperwork. Send us your New Jersey property address and parking count. We screen for traffic, nearby fast chargers, trade-area density and power availability, and qualified sites get a no-cost proposal and letter of intent.
Frequently asked questions
How much is the PSE&G EV charger rebate for commercial properties?
Level 2 Mixed-Use Commercial sites get up to $7,500 per charger for up to four chargers ($30,000), plus up to $10,000 off a utility-side deposit. Public DC fast sites get up to $25,000 per charger for up to four chargers ($100,000), plus up to $50,000 off the utility-side deposit and a Demand Charge Rebate.
Does PSE&G pay for the EV charger itself?
No. PSE&G’s program offsets make-ready costs such as panels, conduit, wiring and service upgrades. Customers are responsible for the cost of the charging units.
Can I combine PSE&G incentives with NJDEP grants?
Yes, if you notify both programs. Combined state or federal funding plus PSE&G incentives can’t exceed 90% of total project cost, or PSE&G reduces its make-ready credit. NJDEP’s It Pay$ to Plug In lists up to $4,000 per Level 2 port.
Is the PSE&G EV charging program ending?
It runs until its allocated funds are used up. PSE&G asked the BPU on June 22, 2026 to extend it through December 2027 with no new funding. The BPU retained the petition for hearing in September 2026, and the extension was pending as of Oct. 21, 2026.
Can I get EV chargers in New Jersey without paying anything?
Yes. We fund 100% of equipment, installation, utility coordination and permitting for Level 3 fast chargers at qualified commercial properties. We own and maintain the station, pay for electricity, and pay you stall rent or a profit share for 10 to 15 years.