SCE EV Charger Rebate for Businesses (2026): Charge Ready Is Closed, Here’s What’s Left

SCE’s main business EV charger rebate, the Charge Ready program, is closed to new applications. Southern California Edison says “Charge Ready applications are no longer being accepted,” and approved projects must have fully signed agreements by December 31, 2026. What’s still open to SCE business customers is Rule 29, under which SCE pays for the utility-side service extension on separately metered EV charging projects, plus the TOU-EV rates. For TOU-EV-8 and TOU-EV-9, SCE says demand charges are currently not applicable.

So if you own a commercial property in SCE territory and want chargers, you’ll now pay for the chargers and the customer-side electrical work yourself, or let a developer fund them. We install Level 3 fast chargers at $0 to qualifying property owners and pay monthly stall rent or a profit share. Check if your SCE-area property qualifies.

What did SCE’s Charge Ready rebates pay?

Here’s what owners are searching for, even though the program is closed now. SCE’s 2024/2025 Charge Ready rebate summary table lists these per-port charging equipment rebates:

Charger typeDisadvantaged community (excl. Fortune 1000)Multifamily (excl. Fortune 1000)All others (incl. Fortune 1000)
Level 2, per port$2,900$1,450$725
DC fast (50 to 350 kW), per port$40,200$20,100$10,050

On top of the equipment rebates, Charge Ready had SCE build the utility-side infrastructure. On the customer side, SCE either built that infrastructure itself or rebated up to 80% of its own estimated cost if you built it yourself. The fast-charging track came with strings. SCE’s DCFC Program Guidelines required:

  • Public access and at least 2 fast-charging ports
  • Make-ready infrastructure sized for at least 150 kW
  • At least 10 years of ownership, operation and maintenance by the participant
  • A TOU rate, demand response enrollment, separate metering and an approved network provider

If you already have a signed or pending Charge Ready agreement, the date to watch is December 31, 2026. SCE’s tools and resources page repeats it: agreements must be fully signed by then. If you’re starting from scratch, Charge Ready isn’t an option.

What SCE EV incentives are still available in 2026?

These are the SCE-specific options that still apply to a new commercial project:

OptionWhat it coversKey conditionsStatus
Rule 29 EV infrastructureSCE designs, pays for and maintains the utility-side service extension (transformer, service conductors, trenching, conduit, metering) for separately metered EV chargingProof of commitment to buy and install chargers; operate them for at least 5 years; enroll in TOU-EV-7, -8 or -9; can’t be combined with Charge Ready at the same siteAvailable
TOU-EV-8 (20 to 500 kW) and TOU-EV-9 (over 500 kW) ratesLower operating risk for fast-charging sitesSeparately metered EV chargingAvailable. SCE says demand charges are “currently not applicable until determined and authorized by the Commission”
Charge Ready equipment and customer-side rebatesChargers and customer-side make-readySee table aboveClosed to new applications

Sources: SCE’s Rule 29 fact sheet and TOU-EV-7, 8 and 9 rate fact sheet.

Rule 29 is useful, but it stops at the meter. Everything on your side of the meter is still yours: switchgear, panels, conduit to the chargers, the chargers themselves, installation, networking and maintenance. Environmental studies, line extension work under Rule 15 and requested relocations can also land on the customer.

State money is a separate track. Our California EV charger rebate guide for businesses covers CALeVIP fast-charger funding and its stacking limits.

How much does an SCE business pay now? Two worked examples

We ran both of our benchmark projects through what’s left. These are planning illustrations from our cost models, not SCE quotes.

Example 1: 4 × 150 kW fast-charging site at a shopping center

Line itemAmount
All-in project budget (our model)about $894,000
Utility-side service work in our model, which Rule 29 could coverabout $93,560
What Charge Ready would have added for a non-DAC site (4 ports × $10,050), if it were open$40,200 (no longer available)
Owner’s remaining cost with Rule 29 onlyabout $800,000
Share coveredabout 10%

The owner who buys also signs up for at least 5 years of operating the chargers, the electric bill, networking, repairs and uptime.

Example 2: 8-port Level 2 hotel project

Line itemAmount
All-in project budget (our model)about $80,000
Old Charge Ready equipment rebate at the “others” rate (8 × $725), if it were open$5,800 (no longer available)
Rule 29Only applies if the project gets its own separately metered EV service. Many hotel Level 2 jobs run off existing service.
Owner’s costMost or all of the $80,000

We install Level 2 too, but we usually recommend owner-paid Level 2 only where incentives cover 60% to 70% or more of the cost. In SCE territory today, they generally don’t. See our hotel EV charger installation guide for markets where they still do.

What’s the $0 alternative for SCE property owners?

Host fast chargers instead of buying them. For a qualifying property, we:

  • Pay 100% of equipment, installation, utility coordination and permitting
  • Install Level 3 DC fast chargers up to 500 kW, where most sessions take 20 to 30 minutes
  • Use about 5 parking spaces: 4 charging stalls plus a small equipment area, expandable to 8
  • Pay you monthly stall rent or a profit share for a 10 to 15 year term
  • Pay the electricity and handle maintenance, damage and sales tax, with a 99%+ uptime standard

You don’t fill out utility forms, sign a 10-year operating commitment, or carry demand-charge risk if the rules change. Our sites average 10 or more sessions per charger per day, so a 4-charger site brings 40 or more drivers to your property daily.

Is your property actually in SCE territory?

Check your bill before you plan anything. SCE serves much of Southern California, including cities like Long Beach, Irvine, Santa Ana, Ontario, San Bernardino, Torrance and Palm Springs. But several big cities in the region run their own municipal utilities, including Los Angeles (LADWP), Anaheim, Riverside, Pasadena, Glendale and Burbank. Those cities have different programs. If you’re in the City of Los Angeles, read our Los Angeles commercial EV charging guide instead.

Which SCE-area properties qualify for hosted fast chargers?

We look for busy, amenity-rich commercial sites in dense trade areas:

  • Grocery-anchored and big-box shopping centers
  • Restaurant, coffee and quick-service pads
  • Convenience stores and fuel sites near freeway exits
  • Mixed-use and lifestyle retail with evening traffic
  • Lots with about 5 spare spaces in a visible spot, with 24/7 access

Our property self-check walks through the factors, and Level 3 charging station installation cost explains where the money goes if you’d still rather own. Submit your SCE-area property for free EV chargers.

Frequently asked questions

Does SCE still offer EV charger rebates for businesses?

Not for new projects. SCE’s Charge Ready program is no longer accepting applications, and approved projects must have fully signed agreements by December 31, 2026. SCE business customers can still use Rule 29 for utility-side service work and the TOU-EV rates.

How much was the SCE Charge Ready rebate per charger?

SCE’s 2024/2025 rebate table listed $40,200 per DC fast port in disadvantaged communities, $20,100 for multifamily and $10,050 for all others. For Level 2 ports, it listed $2,900, $1,450 and $725. Those rebates are closed to new applications.

What is SCE Rule 29?

It’s SCE’s optional EV infrastructure tariff for commercial, industrial and multifamily projects. SCE designs, pays for and maintains the utility-side service extension for separately metered EV charging. You must commit to buy, install and operate chargers for at least 5 years and enroll in a TOU-EV rate.

Does SCE charge demand charges for EV fast charging?

SCE’s TOU-EV rate fact sheet says demand charges for TOU-EV-8 (20 to 500 kW) and TOU-EV-9 (over 500 kW) are currently not applicable until determined and authorized by the California Public Utilities Commission.

Can I get fast chargers in SCE territory without paying for them?

Yes, if your property qualifies. We fund, install and operate Level 3 fast chargers at $0 to the owner, pay monthly stall rent or a profit share for 10 to 15 years, and cover electricity, maintenance and damage.

How much does a 4-charger fast site cost an SCE business without Charge Ready?

In our model, a 4-stall, 150 kW site costs about $894,000 all-in. Rule 29 could cover roughly $93,560 of utility-side work, which leaves the owner about $800,000 plus at least 5 years of operating costs.